Laserfiche WebLink
e. Any damage to existing street or sidewalk improvements during construction <br />on the subject property shall be repaired to the satisfaction of the City <br />Engineer at full expense to the developer. This shall include slurry seal, <br />overlay, or street reconstruction if deemed warranted by the City Engineer. <br />7. Phasing. Phase I—Infrastructure Improvements for the Staples Ranch Site. Prior <br />to occupancy of any building on site: <br />a. The stormwater flow control basin in the Neighborhood Park shall be <br />constructed and operational as determined by the City Engineer. <br />b. The Stoneridge Drive extension from Trevor Parkway to EI Charro Road <br />shall be constructed and operational, as determined by the City Traffic <br />Engineer. <br />c. The ACSPA shall replace the existing eight -inch water line in Staples Ranch <br />Drive between Vermont place and the senior continuing care community site <br />(PUD -68) site with a new 12 -inch water line. Prior to occupancy, the <br />ACSPA shall reconnect all existing house water service connections along <br />Staples Ranch Drive to this new water main. The location of the new line, <br />and the timing of the connections shall be subject to the review and <br />approval of the City Engineer. <br />d. All public water and sewer lines loops on the PUD site shall be installed. All <br />necessary public water and sewer line loops shall be installed as <br />determined by the City Engineer. <br />e. All emergency vehicle access (EVA) connection points shall have a knox <br />box, as determined by the Fire Marshal. <br />An access easement shall be provided to Zone 7 and the City of Pleasanton <br />allowing for maintenance equipment to access the Arroyo Mocho. The <br />easement shall be located generally as shown on Exhibit B for Case <br />PUD -68 and shall be redesigned to be wide enough to accommodate the <br />largest pieces of maintenance equipment anticipated to be used in the <br />Arroyo Mocho. The applicant shall use Auto Turn or similar software <br />approved by the City Engineer to determine how wide the easement should <br />be. The final location, width, and design of the easement shall be subject <br />to the review and approval of Zone 7 and the City Engineer. <br />g. All street landscaping and public sidewalks required as part of the PUD. <br />8. Trash Enclosures. All trash and refuse shall be contained completely within the <br />approved trash enclosure. The materials and color of the enclosure shall match <br />the building and the gates shall be corrugated metal or solid wood. The design of <br />the enclosure (all four sides) shall be shown on the plans submitted for issuance of <br />building permits. The design and location of the trash enclosures shall be subject <br />to the approval of the Director of Community Development and Fire Chief. Trash <br />n <br />