Laserfiche WebLink
18. A final landscape plan and irrigation plan shall be submitted to and approved by <br />Planning Division as part of the building permit plan set prior to issuance of an <br />on-site permit. Said landscape plan shall be consistent with the approved <br />landscape plan plus any conditions of approval, and shall be detailed in terms of <br />species, location, size, quantities, and spacing. <br />19. The project developer shall provide root control barriers and four inch perforated <br />pipes for parking lot trees, street trees, and trees in planting areas less than ten - <br />feet in width, as determined necessary by the Planning Division at the time of <br />review of the final landscape plans. <br />Fire Department Requirements <br />20. The new building(s) covered by this approval shall be equipped with an <br />automatic fire sprinkler system. Plans and specifications for the automatic fire <br />sprinkler system shall be submitted to the Building and Safety Division for review <br />and approval prior to installation. The fire alarm system shall have plans and <br />specifications submitted to Fire Prevention for review and approval prior to <br />installation. All required inspections and witnessing of tests shall be completed <br />prior to final inspection and occupancy of the building(s). <br />21. The applicant shall meet all requirements of the Pleasanton Fire Code <br />(Pleasanton Municipal Code, Chapter 20.24). <br />Engineering Requirements <br />22. The applicant shall cover the new trash enclosure, shall direct -connect the <br />enclosure to the development's sanitary sewer system, and shall install a hose - <br />bib inside the enclosure. If, however, the City Engineer determines that that <br />sanitary sewer connection is a hardship, the applicant shall create a dry sump in <br />the trash enclosure that is covered with a standard grate. The sump shall be <br />sized to handle any anticipate spills and shall be pumped out manually. In either <br />case, the enclosure shall drain towards the sewer drain or sump and all drainage <br />outside the enclosure shall be designed to drain away from the structure. <br />23. The haul route for all materials to/from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br />24. The applicant shall submit a refundable cash bond for hazard and erosion control <br />prior to issuance of an Engineering permit. The amount of this bond will be <br />determined by the City Engineer. <br />25. Any damage to existing public street improvements during construction on the <br />subject property shall be repaired to the satisfaction of the City Engineer at full <br />expense to the applicant. This shall include slurry seal, overlay, or street <br />reconstruction if deemed warranted by the City Engineer. <br />5 <br />