Laserfiche WebLink
36. If grading is to occur during the raptor -nesting season (February 1 to August 31), <br />a focused survey for raptor nests in the adjacent trees shall be conducted by a <br />qualified biologist during the nesting season. The survey shall be conducted no <br />less than 14 days and no more than 30 days prior to the beginning of grading. If <br />nesting raptors are found during the focused survey, no grading shall occur <br />within 500 feet of an active nest until the young have fledged (as determined by a <br />qualified biologist), or until the project applicant receives written authorization <br />from California Department of Fish and Game to proceed. <br />37. All site improvements and construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Friday. In addition, no construction shall <br />be allowed on Saturday, Sunday, and Federal and State Holidays. The Director <br />of Planning and Community Development may allow earlier "start times" or later <br />"stop times" only for specific construction activities (e.g., concrete -foundation/ <br />floor pouring), if it can be demonstrated to the satisfaction of the Director of <br />Planning and Community Development that the construction and construction <br />traffic noise of the modified construction hours will not affect nearby residents. <br />All construction equipment must meet DMV noise standards and shall be <br />equipped with muffling devices. <br />38. Construction trailers shall be allowed to be placed on the project site for daily <br />administration/coordination purposes of the subdivision improvements during the <br />construction period. At no time shall campers, trailers, motor homes, or any <br />other vehicle be used as living or sleeping quarters on the construction site. All <br />such vehicles shall be removed from the site at the end of each workday. <br />39. Dust and mud shall be contained within the boundaries of the property during <br />times of construction. The project developer shall submit a dust control plan or <br />procedure as part of the improvement plans. <br />40. The developer shall be responsible for conducting vermin control prior to and <br />during the grading of the property. <br />41. Unless a phasing plan for improvements is approved by the Director of Planning <br />and Community Development, the applicant shall complete all of the on-site <br />improvements at one time. <br />42. The project developer shall submit a waste generation disposal and diversion <br />plan to the Planning Division prior to construction. The plan shall include the <br />estimated composition and quantities of waste to be generated and how the <br />project developer shall recycle at least fifty percent (50%) of the job site <br />construction and demolition waste. Proof of compliance shall be provided to the <br />Director of Planning and Community Development prior to final inspection. <br />During demolition and construction, the project developer shall mark all trash <br />disposal bins "trash materials only" and all recycling bins "recycling materials <br />only". The project developer shall contact Pleasanton Garbage Service for all <br />