Laserfiche WebLink
r <br />70. Unless otherwise approved by the City Engineer, all fill and cut slopes shall be <br />3:1 horizontal to vertical or less. <br />71. The project developer shall install street frontage improvements on Vineyard <br />Avenue and Vine Street per Chapter 19.40.010 of the Pleasanton Municipal Code <br />and to the satisfaction of the City Engineer. These improvements may include, <br />but are not necessarily limited to, grading, curb and gutter, sidewalk, paving, <br />storm drain, sanitary sewer, water facilities, street lighting, underground utilities, <br />traffic control devices, landscaping, and automatic irrigation systems. <br />72. The project developer shall submit a refundable cash bond for hazard and <br />erosion control prior to issuance of an engineering or building permit. The <br />amount of this bond will be determined by the City Engineer. <br />73. The haul route for all materials to and from this development shall be approved <br />by the City Engineer prior to the issuance of an encroachment permit. <br />74. The project developer shall submit a dust control plan or procedure as part of the <br />improvement plans. <br />75. The design of the water supply and sanitary sewer systems shall be subject to <br />the review and approval of the City Engineer. <br />76. Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense <br />to the applicant. This shall include slurry seal, overlay, or street reconstruction if <br />deemed warranted by the City Engineer. The development side of Birch Creek <br />Drive from Vine Street to Vineyard Avenue shall be overlaid or slurry sealed at <br />the City Engineer's discretion. <br />77. The project developer's contractor(s) shall obtain an encroachment permit from <br />the City Engineer prior to moving any construction equipment onto the site. <br />78. Bulk construction materials stored outdoors that may contribute to the pollution of <br />storm water runoff shall be covered as required by the City Engineer and/or the <br />Chief Building Official. <br />79. The applicant shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City -approved methods and materials. On-site <br />storm drain facilities shall be cleaned a minimum of twice a year as follows: <br />immediately prior to October 15 and once in January. Additional cleaning may be <br />required if found necessary by the City Engineer/Chief Building Official. <br />11 <br />