My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
121917
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 2:12:47 PM
Creation date
12/13/2017 10:56:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/19/2017
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? 6"314 5 3 <br /> thereafter incurs costs in connection with the <br /> completion of any Traffic Mitigation Improvements; such <br /> payment may be made in installments, as necessary, in <br /> order to satisfy the foregoing, and any such accrued <br /> payment obligation shall continue as an obligation of <br /> Developer (or its successor) to the extent the same <br /> remains unpaid at the termination of this Agreement. <br /> (Notwithstanding the foregoing, Developer (or its <br /> successors) may elect not to defer payment of <br /> Developer's Estimated Required Payment as referred in <br /> the preceding sentence, but rather may pay same to the <br /> City upon issuance of the aforesaid building permit.) <br /> The foregoing reference to "allocable portion" shall be <br /> understood to refer to that circumstance 1where <br /> Developer (or its successor) completes only a portion <br /> of the Project as referred to on Exhibit F; by way of <br /> example, if Developer (or its successor) were to <br /> construct an additional 100,000 sq. ft. of Floor Area <br /> within the Shopping Center, then Developer's allocable <br /> portion of its Estimated Required Payment would be <br /> 17.9% (100,000 sq. ft. divided by the total Project <br /> size of 558,000 sq. ft. as shown on Xxhibit F) of the <br /> total Estimated Required Payment for Developer (i.e. , <br /> 0.179 x $482,149 = approximately $86,305) . <br /> (ii) Increase in Net Estimated Traffic Mitigation <br /> Improvements Costs. Any portion of the Net Estimated <br /> Traffic Mitigation Improvements Costs not paid to the <br /> City by Developer by January 1, 1999 shall increase by <br /> an interest factor equal to the Prime Rate from such <br /> date to the date of payment. The term "Prime Rate" <br /> shall mean the rate of interest which Wells Fargo Bank, <br /> N.A. ("WFB") announces publicly at its main office in <br /> San Francisco, California, as its "prime rate" for <br /> unsecured commercial loans. If WFB no longer announces <br /> a prime rate, the term "Prime Rate" shall mean the <br /> "reference rate", "base rate" or other comparable rate <br /> which WFB announces in lieu of the prime rate. Changes <br /> in the Prime Rate shall be effective as of the date <br /> announced by WFB. <br /> (d) J4ability of Contributing Projecta.i In addition <br /> to Developer's property, other properties will benefit from <br /> the Traffic Mitigation Improvements. The boundaries of such <br /> benefitted properties are depicted on Exhibit' G attached <br /> hereto. As of October 1, 1997, the City has identified five <br /> "Contributing Projects" which will benefit friom completion <br /> of the Traffic Mitigation Improvements, as shown on <br /> Exhibit F. The City has assigned each Contributing Project <br /> (including Developer's) a percentage share of the <br /> responsibility for participating in the cost* to complete <br /> the Traffic Mitigation Improvements. That percentage share <br /> of the Traffic Mitigation Improvements Costs of each of the <br /> currently identified Contributing Projects and their <br /> required payments are also shown on Exhibit F. Each <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.