My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
121917
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 2:26:45 PM
Creation date
12/13/2017 10:44:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/19/2017
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> As a continuation of course renovation work that started last year, on February 21, <br /> 2017, Council awarded a not-to-exceed $140,000 contract to D.H.R Construction Inc. <br /> for the renovation of bunkers on holes #3, #8, and #9 to keep up with the Callippe <br /> Preserve Golf Course multi-year bunker improvement plan. <br /> DISCUSSION <br /> During moderate rain events, sand erodes from the bunker faces exposing dirt and rock <br /> which washes into the existing bunker sand, thus leading to poor drainage and <br /> consequently limited playability. Due to this contamination, the bunkers no longer drain <br /> effectively and are difficult to maintain. <br /> In order to achieve a successful project, D.H.R Construction Inc. utilized the Better Billy <br /> Bunker Method to renovate the six bunkers located on holes #3, #8 and #9. Once the <br /> contaminated sand is removed from the bunker the interior drainage system is <br /> inspected for improvement or replacement. After the drainage system has been cleaned <br /> or replaced, a two inch layer of gravel is installed. The gravel is then sprayed with a <br /> ST410 polymer that binds the gravel to prevent future sand contamination from erosion. <br /> Once the polymer has cured, a four inch layer of bunker sand is installed. <br /> All of the work has been completed to the satisfaction of the Director of Operations <br /> Services and it is recommended that the project be accepted as complete. <br /> Budget <br /> The final contract cost is $133,202.20 from the original allocated funding of$140,000. <br /> Staff recommends the project balance of$6,797.80 be transferred to the FY 2017/18 <br /> Golf Course Repair and Replacement Budget. The final project funding and <br /> expenditures are summarized in Attachment 1 to this report. <br /> Su•mitte•. Fiscal Review: Approved by: <br /> l <br /> 1 <br /> 101i ' <br /> /4/6„. <br /> hleen Yurchak Tina Olson Nelson Fialho <br /> Director of Operations Director of Finance City Manager <br /> and Water Utilities <br /> Attachment: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />