• <br /> Page 2 <br /> City of Pleasanton <br /> November 16, 2017 <br /> 60 Ton crane truck for removal 4,000.00 <br /> Field labor to separate the bowl assembly <br /> and motor drain oil, cap motor including boom truck 2,655.00 <br /> Handling, crating, cleaning and <br /> Shipping motor back to Flowserve <br /> In Taneytown, MD 5,000.00 <br /> Field labor to set up bowl assembly <br /> and motor including boom truck 2,975.00 <br /> Estimated field labor to install new pumping equipment 5,060.00 <br /> 60 Ton boom truck for reinstallation 4.000.00 <br /> Estimated Total $167,068.36 <br /> Delivery on new equipment 12 Weeks <br /> Notes: <br /> m One year warranty on new pumping equipment <br /> • <br /> ® The above rate to be based on Pump Installer. If this project requires a <br /> different wage classification, per DIR prevailing wage the field labor rate <br /> will be adjusted to match that classification. <br /> If you have any questions on the above, please give me a call. <br /> Sincerely, <br /> Wayne Archer <br /> WA/dm <br /> Wayne171City of Pleasanton 111517 <br />