Laserfiche WebLink
FY 2016/17 CAPITAL IMPROVEMENT PROGRAM ATTACHMENT 3 <br /> SEWER PROJECTS , <br /> Recommended Budget Carryovers to FY18 <br /> Expansion Replacement Developer <br /> CIP# Fund Fund Contributions Total <br /> 432 431 241 <br /> BEGINNING SEWER FUND BALANCE $2,868,670 $10.206,217 $185,601 $13.260,488 <br /> TOTAL FUNDS AVAILABLE $2,868,670 $10,206,217 $185,601 $13,260,488 <br /> EXPENDITURES: <br /> 16202 _ Annual Sewer Main Replacement and Improvements 0 1,977.068 0 1.977,068 <br /> 16220 Annual Sewer Pump and Motor Repairs 0 157,033 0 157,033 <br /> 16230 Bi-Annual Sewer Electrical Panel Improvements 0 93,619 0 93.619 <br /> 16217 Bi-Annual Sewer Emergency Generator Improvements 0 91.678 0 91,678 <br /> 16439 Misc Maintenance Management Software(See Misc CIP) 0 66.667 0 66,667 <br /> 16245 Sewer System Master Plan and Model Update 0 150.000 0 150,000 <br /> 05522 Old Stanley Blvd Reconstruction and Undergrounding Utility 0 122.377 0 122.377 <br /> 11231 EALS/EARS Pump Station and Pipeline 161,000 4,498,899 37.128 4.697.027 <br /> 13224 Sewer Connection Fee Update 25,000 0 0 25,000 <br /> 13226 Meadowlark Sewer Siphon 200,000 440,960 0 640,960 <br /> 13231 Sewer Rate Analysis 0 9.432 0 9,432 <br /> 13233 Sewer Telemetry Upgrades 0 81,777 0 81,777 <br /> 15201 Bi-Annual Sewer Maintenance Hole Improvements 0 114,459 0 114,459 <br /> _ 90228 _ Del Valle Parkway/Nevada St Sewer Additions 482,369 356,505 0 838,874 <br /> 99999 Future Designated CIP Projects* 0 0 148,473 148,473 <br /> 99999 General Fund-CIP Engineering and Inspection 0 0 0 0 <br /> TOTAL SEWER PROJECTS $868,369 $8,160,474 $185,601 $9,214.444 <br /> ENDING SEWER FUND BALANCE $2,000.30 I $2,045,743 $0 $4,046.044 <br /> *Per Developer Contributions worksheet maintained by the Finance Department <br /> • <br /> • <br /> Page B1 <br />