Laserfiche WebLink
BACKGROUND <br /> Type 3 Fire Engines are smaller than standard engines and are primarily used for <br /> vegetation and wildland interface fires where homes are amongst the vegetation. The <br /> four-wheel capability allows these engines to respond to emergencies in the wildland <br /> interface areas of Pleasanton. <br /> LPFD currently operates two Type 3 Fire Engines within the city of Pleasanton. The <br /> age of Engine 620 is 20 years old, and the age of Engine 623 is 23 years old. The age <br /> of these vehicles has created reliability and maintenance challenges which require <br /> taking these engines out of service for extended periods of time for repairs. A major <br /> challenge to maintaining these engines is the lack of availability of the required obsolete <br /> parts and outdated technology. <br /> From January 1, 2014 to August 1, 2017, the Mechanics shop has spent a combined <br /> total of 846 staff hours and $91,388.71 in maintenance costs. Some of the <br /> maintenance repairs had to be contracted out to Alameda County Fire creating <br /> additional time delays and costs. <br /> DISCUSSION <br /> Staff is requesting the purchase of two replacement Regional NWCG Rear Pump Panel <br /> Type 3 Fire Engines from EJ Metals, purchased through Golden State Fire Apparatus. <br /> This purchase will utilize the Western Fire Chiefs/ Fire Rescue NPPGov purchase <br /> consortium program. <br /> A total of$400,000 for each engine ($800,000 total) is budgeted in both the FY 2017/18 <br /> and FY 2018/19 in the Fire Apparatus Repair & Replacement budget (51320113- <br /> 410107). The actual cost of each engine is $350,573.16 bringing the total cost of this <br /> purchase to $701,146.32 before sales tax, or$766,002.35 with tax included. If <br /> approved, a mid-year adjustment will take place to allocate funding into the current <br /> fiscal year. <br /> Cost breakdown for the Type 3 Fire Engines <br /> Two (2) Ford F-750 4X4 Type 3 Engines $ 718,735.06 <br /> Subtotal $ 701,146.32 <br /> Factory Inspection Trips (3 people x 2 trips) Included <br /> Discount for Pre-Payment option ($ 17,588.74) <br /> Tax (9.25%) $ 64,856.03 <br /> Total $ 766,002.35 <br /> Page 2 of 3 <br />