Laserfiche WebLink
Exhibit A <br /> Contract#: 14-1247C <br /> CONTRACTS LABOR AND EQUIPMENT RATES <br /> STREET,PARKING LOT AND PATHWAY LIGHTS ONLY <br /> rrra.T.T.!§Tror, <br /> RegularMx 4 ittividilli <br /> Lighting Tech $66.24 $99.36 $99.36 <br /> Laborer $92.12 $123.17 $123.17 <br /> Street Light Truck $24.84 $24.84 $24.84 <br /> Foreman Rate <br /> Journey Rate $101.43 $132.48 $132.48 <br /> Apprentice Rate $76.59 $114.89 $114.89 <br /> Other(Crane Truck) N/A N/A N/A <br /> ASSOCIATED COSTS <br /> STREET,PARKING LOT AND PATHWAY LIGHTS ONLY <br /> :.:Strvice PgsPriPtimu 4 I, .1tA, „ VOW L WOO <br /> Install New Arm and Luminaire on PG&E Power Pole (LED NEW) Each $978.08 <br /> Night Check Hour $66.24 <br /> Pole Painting Each $186.30 <br /> Lamp Disposal Rate Each $2.17 <br /> 1. Percent of mark-up on material including overhead and profit: 1.20% <br /> 2. Percent of mark-up on outside equipment(equipment pre-approved by the City): 1.20% <br /> CM12-921 Page 1 <br />