Laserfiche WebLink
<br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or grav- <br />eled areas during wet weather. Broom sweep the street pavement adjoining the pro- <br />ject site on a daily basis. Scrape caked-on mud and dirt from these areas before <br />sweepmg. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown <br />or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not dis- <br />charge wash water into street, gutters, or storm drains. <br /> <br /><END> <br /> <br />2-99-079. Final Conditions of Approval <br />Kevin BestlPanattoni Development Company <br /> <br />August 25, 1999 <br />Page 17 of 17 <br />