Laserfiche WebLink
<br />90. The project developer's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site. <br /> <br />Urban Stormwater Runoff Requirements: <br /> <br />91. The project developer shall install a structural control, such as an oil/water separator, sand <br />filter, or approved equal in the parking lot to intercept and pretreat storm water prior to <br />reaching the storm drain. The design, locations, and a schedule for maintaining the <br />separator shall be submitted to the City Engineer/Director of Building Inspection for <br />review and approval prior to issuance of building permits. The structural control shall be <br />cleaned at least twice a year: once immediately prior to October 15 and once in January. <br />The project developer shall enter into a maintenance agreement for the oil/water <br />separator. <br /> <br />92. All trash enclosure area(s) shall be completely covered. An area drain shall be installed <br />in the enclosure area which connects to the sanitary sewer. A structural control such as <br />an oil/water separator or sand filter shall be provided. No other area shall drain into the <br />trash enclosure; a berm shall be installed to prevent such drainage if found necessary by <br />the City EngineerIDirector of Building Inspection. A sign shall be posted prohibiting the <br />dumping of hazardous materials into the sanitary sewer. The project developer shall <br />notifY the Dublin-San Ramon Services District (DSRSD) upon installation of the sanitary <br />connection; a copy of this notification shall be provided to the Planning Department. <br /> <br />93. The project developer shall sweep or vacuum the parking lot and sidewalks a minimum of <br />once a month and shall prevent the accumulation of litter and debris on the site. Corners <br />and hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br />agent or degreaser is used, wash water must be collected and discharged to the sanitary <br />sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br /> <br />94. If used, paved outdoor storage areas shall be designed to minimize pollutant runoff. Bulk <br />materials stored outdoors that may contribute to the pollution of storm water runoff must <br />be covered as deemed appropriate by the Planning DirectorlDi- rector of Building <br />Inspection. <br /> <br />95. The project developer shall include erosion control/storm water quality measures on the <br />final grading plan which shall specifically address measures to prevent soil, dirt, and <br />debris from entering the storm drain system. Such measures may include, but are not <br /> <br />2-99-079. Final Conditions of Approval <br />Kevin BestlPanattoni Development Company <br /> <br />August 25. 1999 <br />Page 15 ofl7 <br />