Laserfiche WebLink
<br />57. Approval of the storm drainage system shall be subject to the review and approval <br />of the City Engineer and Zone 7, as applicable, that the system is adequate, <br />connects to an approved point of discharge, meets any and all applicable <br />requirements of the Alameda County Flood Control District - Zone 7, meets any <br />and all applicable requirements of the Federal Emergency Management Flood <br />Hazard Program, the California Department of Fish and Game, and meets the <br />immediate and long-range requirements of this development and all upstream areas <br />intended to be drained through this development. <br /> <br />58. Electric power distribution, gas distribution, communication service, cable <br />television, and any required alarm systems shall be installed underground in a joint <br />utility trench unless otherwise specifically approved by the City Engineer or <br />Director of Building Inspection. <br /> <br />59. Should street lighting be desired, the applicant shall be responsible for the <br />installation of the street lighting system serving the development. The street lights <br />shall be generally consistent with the Greenbriar PUD development plan and shall <br />be privately owned and maintained. Approval for the number, location, and type <br />of electroliers shall be subject to the review and approval of the City Engineer. <br /> <br />60. Street lighting for the development shall be designed and located so as to minimize <br />visibility to the greatest extent possible, subject to the review and approval of the <br />City Engineer and Planning Director. <br /> <br />61. Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense to <br />the developer. This shall include slurry seal, overlay, or street reconstruction if <br />deemed warranted by the City Engineer. <br /> <br />62. The applicant's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site. <br /> <br />63. The applicant shall comply with the City's non-point storm drain run-off <br />ordinance. <br /> <br />64. The applicant shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. <br /> <br />PUD-99-02 <br /> <br />Planning Commission - Conditions of Approval <br /> <br />Page 11 <br />