Laserfiche WebLink
<br />d. Create a contained and covered area on the site for the storage of bags, ce- <br />ment, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. <br /> <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br /> <br /><END> <br /> <br />PUD-99-07, Final Conditions of Approval <br />Per Planning Commission <br /> <br />August 12.1999 <br />Page 13 of 13 <br />