Laserfiche WebLink
<br />Resolution No. PC-99-32 <br />Page 17 <br /> <br />subject to the review and approval of the City Engineer/Director of Building <br />Inspection. Ifno grading plan is required, necessary erosion control/storm water <br />quality measures shall be shown on the site plan submitted for an on-site permit, <br />subject to the review and approval of the Director of Building Inspection. The <br />applicant is responsible for ensuring that the contractor is aware of and implements <br />such measures. <br /> <br />87. All metal roofs shall be finished with rust-inhibitive paint. <br />