Laserfiche WebLink
<br />Resolution No. PC-98-90 <br /> <br />Page 15 <br /> <br />h.) Construction access routes shall be limited to those approved by the City <br />Engineer or Building Inspector and shall be shown on the approved grading plan. <br /> <br />77. The final design ofthe turf-lined swale biofilter strip shall be subject to the review <br />and approval ofthe City Engineer and Planning Director prior to issuance of an <br />on-site permit for the project. For those areas ofthe site that do not drain to the <br />biofilter strip, the applicants shall install structural control(s), such as an oil/water <br />separator, sand filter, or approved equal (e.g., Dura Drain Fossil Pilterâ„¢) in the <br />parking lot to intercept and pretreat storm water prior to reaching the storm drain. <br />The design, locations, and a schedule for maintaining the separator shall be <br />submitted to the City Engineer/Director of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be <br />cleaned at least twice a year: once immediately prior to October I and once in <br />January. The applicants shall enter into a maintenance agreement for the oil/water <br />separator with the City. <br /> <br />78. The applicants shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. On-site <br />storm drain facilities shall be cleaned a minimum of twice a year as follows: <br />immediately prior to October 15 and once in January. Additional cleaning may be <br />required if found necessary by the City Engineer/Director of Building Inspection. <br /> <br />79. The applicants shall sweep or vacuum the parking lot a minimum of once a month <br />and shall regularly sweep the adjacent public sidewalks in order to prevent the <br />accumulation of litter and debris on and around the site. Corners and hard to reach <br />areas shall be swept manually. If sidewalks and/or the parking lot are pressure <br />washed, debris must be trapped and collected to prevent entry into the storm drain <br />system. No cleaning agent may be discharged into the storm drain. If any <br />cleaning agent or degreaser is used, wash water must be collected and discharged <br />to the sanitary sewer, subject to approval of the Dublin-San Ramon Services <br />District (DSRSD). <br /> <br />80. The trash enclosure area shall be completely covered. An area drain shall be <br />installed in the enclosure area which connects to the sanitary sewer. A structural <br />control such as an oil/water separator or sand filter shall be provided. No other <br />area shall drain into the trash enclosure; a berm shall be installed to prevent such <br />drainage if found necessary by the City Engineer/Director of Building Inspection. <br />A sign shall be posted prohibiting the dumping of hazardous materials into the <br />sanitary sewer. The applicants shall notifY the Dublin-San Ramon Services <br />District (DSRSD) upon installation of the sanitary connection; a copy of this <br />notification shall be provided to the Planning Department. {end} <br />