Laserfiche WebLink
<br />plans shall show compliance with 2907(d) and 70012(d) of the Uniform Building <br />Code. <br /> <br />41. The applicant shall submit two copies of the site soils report to the Director of <br />Building Inspection for third party peer review and shall pay for such review at the <br />time specified by the Director, but in all cases before the issuance of a grading <br />permit. <br /> <br />42. The applicant shall submit record tract grading plans showing: I) the elevation of <br />all four comers of the site as well as the center ofthe site, 2) all top and toe of <br />slope elevations, and 3) the top and toe of all retaining wall elevations. The <br />record grading plan is to be submitted to the Director of Building Inspection before <br />the first house final. <br /> <br />43. The soils engineer shall certifY the pad compactions of all lots containing fill to the <br />satisfaction of the Director of Building Inspection prior to the issuance of building <br />permits. <br /> <br />44. Building and situs plans are to be submitted to the Building Department on <br />computer disk in a format approved by the Chief Building Official. Digitized <br />information shall be submitted before requesting a final inspection and should <br />reflect as-built situs and architectural information as approved by the Chief <br />Building Official. <br /> <br />45. Portable toilets used during construction shall be kept as far as possible from <br />existing residences and shall be emptied on a regular basis as necessary to prevent <br />odor. <br /> <br />Fire <br /> <br />46. The applicant shall post address numerals on each building so as to be plainly <br />visible from all adjoining streets or driveways during both daylight and night time <br />hours. <br /> <br />47. The development shall meet all the requirements of the Pleasanton Fire Code <br />(Chapter 20.24 ofthe Pleasanton Municipal Code). <br /> <br />48. The site shall be kept free of fire hazards from the start of lumber construction to <br />the final inspection. <br /> <br />Page 53 <br /> <br />PUD-96-14 <br />