My WebLink
|
Help
|
About
|
Sign Out
PC-98-72
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-72
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:03 AM
Creation date
12/17/2003 3:11:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/23/1998
DOCUMENT NO
PC-98-72
DOCUMENT NAME
UP-98-53
NOTES
CARL RODRIGUES/CARL'S CUSTOM CABINETS
NOTES 3
CABINET SHOP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-98-72 <br />Page 4 <br /> <br />EXHIBIT B <br />Conditions of Approval <br />Case UP-98-53 <br /> <br />1. The operation of the cabinet shop shall conform substantially to the site plan, floor <br />plan, and statement, Exhibit "A", stamped "Received August 14, 1998", on file <br />with the Planning Department, except as modified by the following conditions. <br />Minor changes to the plans and/or conditions may be allowed subject to the <br />approval of the Planning Director if found to be in substantial conformance to the <br />approved exhibits. <br /> <br />2. If the cabinet shop use ceases for a period of 90 consecutive days, approval of the <br />use shall become null and void, and a new cabinet shop shall require a separate <br />conditional use permit. <br /> <br />3. This use permit is approved for this specific location only and is not transferable to <br />any other location without City approval. <br /> <br />4. Hours of operation of the cabinet shop and material deliveries to the site shall be <br />limited to 8:00 AM to 5:00 PM, Monday through Friday. <br /> <br />5. All construction activities shall take place indoors, and all of the doors to the <br />cabinet shop shall be closed when the mechanical equipment is in operation. <br /> <br />6. Within one month of the effective date of this approval, the applicant shall apply <br />for all necessary permits to bring the tenant space into compliance with all current <br />Building and Fire Code requirements. <br /> <br />7. If operation of the cabinet shop results in conflicts pertaining to parking, noise, <br />traffic, or other impacts, at the discretion of the Planning Director, this conditional <br />use permit may be referred to the Planning Commission for subsequent review at a <br />public hearing. If necessary, the Commission may modifY or add conditions of <br />approval to mitigate such impacts, or may revoke said conditional use permit. <br /> <br />{end} <br />
The URL can be used to link to this page
Your browser does not support the video tag.