PC-98-63
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-63
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:02 AM
Creation date
12/17/2003 2:18:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/29/1998
DOCUMENT NO
PC-98-63
DOCUMENT NAME
PUD-97-14
NOTES
CHEVRON PRODUCTS CO, INC
NOTES 3
24 HR SELF SERVICE GAS STATION, CONVENIENCE STORE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Engineering Requirements: <br /> <br />51. The width of the driveway entrance from V alley Avenue shall be reduced to forty <br />feet (40' 0"). Both sides of this driveway entrance shall be constructed with curved <br />"returns". The design of this driveway shall be submitted for review and approval <br />by the Planning Director and the City Engineer before issuance of a building per- <br />mit. <br /> <br />52. The driveway entrance from Santa Rita Road to the service station site and the <br />driveway entrance to the Amador Shopping Center shall be constructed with <br />curved "returns". The design of these driveways shall be submitted for review and <br />approval by the Planning Director and the City Engineer before issuance of a <br />building permit. <br /> <br />53. The property owner shall dedicate in fee title to the City of Pleasant on, an approxi- <br />mate nine-foot (9' 0") wide strip of land the entire length of the site's Valley A ve- <br />nue frontage for a right-turn lane from eastbound Valley Avenue to southbound <br />Santa Rita Road. The construction of the street widening including curb, gutter, <br />sidewalks, street trees, and irrigation to said trees shall be the project developer's <br />responsibility and shall be executed in conjunction with construction of this pro- <br />ject. The City of Pleasant on shall be responsible for the costs involved to relocate <br />the existing traffic signal including the installation of detector loops, signal control <br />boxes, and, potentially, a new signal mast. Improvement plans for the turn-lane <br />shall be prepared by the project developer and submitted to the City Engineer for <br />review and approval in conjunction with the building permit application. The <br />right-of-way dedication shall be executed between the project developer and the <br />City prior to issuance of a building permit. <br /> <br />54. All utilities shall be installed underground. <br /> <br />55. The paving sections for the on-site parking and drive areas shall be designed on the <br />basis of an R-Value test and a traffic index to carry the anticipated traffic loads. <br />This design shall be subject to the approval of the Director of Building Inspection. <br />The minimum paving section shall be two inches (2") of asphalt concrete (A.C.) on <br />a six inch (6") asphalt base (A.B.). The minimum A.C. pavement slope shall be <br />one percent (I %). For pavement slopes less than I %, the surface runoff shall be <br />carried in a concrete gutter to an acceptable point of discharge. The minimum <br />slope for concrete gutter shall be 0.5%. <br /> <br />Planning Commission Conditions of Approval <br />Case PUD-97-14 (Chevron) <br /> <br />July 29. 1998 <br />Page 9 of 13 <br />