Laserfiche WebLink
<br />Resolution No. PC-98-5l <br />Page II <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and equipment off paved or graveled areas <br />during wet weather. Broom sweep the street pavement adjoining the project site on a <br />daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />in the storm drain system. Maintain and/or replace filter materials to ensure effectiveness <br />and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown or in <br />the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br />discharge wash water into street, gutters, or storm drains. <br /> <br />Urban Clean Water Run-Off <br /> <br />48. The applicant shall comply with the City's non-point storm water discharge ordinance. <br /> <br />49. The applicant shall install a structural control, such as an oil/water separator, sand filter, <br />or approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City EngineerlDirector of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be cleaned at <br />least twice a year: once immediately prior to October 15 and once in January. The <br />applicant shall enter into a maintenance agreement for the oil/water separator. <br /> <br />50. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation of litter and debris on the site. Corners and <br />hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br />agent or degreaser is used, wash water must be collected and discharged to the sanitary <br />sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br />