My WebLink
|
Help
|
About
|
Sign Out
PC-98-42
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-42
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:01 AM
Creation date
12/17/2003 11:07:26 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/10/1998
DOCUMENT NO
PC-98-42
DOCUMENT NAME
Z-98-129
NOTES
FRANK AUF DER MAUR
NOTES 3
SERVICE COMMERCIAL BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-98-42 <br />Page 11 <br /> <br />68. The applicant shall comply with the City's non-point storm drain ordinance. <br /> <br />69. Prior to commencement of any clearing, grading, or excavation, the applicant shall <br />submit to the Planning Department a copy of the State Water Resources Control Board <br />Notice ofIntent (NOI) for coverage under the State Construction Storm Water General <br />Permit. <br /> <br />70. The applicant shall submit a construction Best Management Practice (BMP) program for <br />review and approval by the Planning Director prior to issuance of any building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed in this program. Failure to comply <br />with the approved construction BMP may result in the issuance of correction notices, <br />citations, or a project stop work order. <br /> <br />71. The applicant is responsible for implementing the following measures during all <br />construction phases of the subject project: <br /> <br />a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use tarps <br />on the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement, <br />and storm drains adjoining the project site. During wet weather avoid driving vehicles <br />off paved areas. <br /> <br />c.) Broom sweep the public street pavement adjoining the project site on a daily basis. <br />Caked-on mud or dirt shall be scraped from these areas before sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />into the City storm drain system. Filter materials shall be maintained and/or replaced as <br />necessary to ensure effectiveness and to prevent street flooding. Dispose of filter <br />particles in the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, cement, paints, <br />flammable, oils, fertilizers, pesticides, or any other materials used on the project site that <br />have the potential for being discharged to the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br />storm drain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.