My WebLink
|
Help
|
About
|
Sign Out
RES 17976
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2017
>
RES 17976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2017 9:31:19 AM
Creation date
11/13/2017 4:40:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/7/2017
DESTRUCT DATE
PERMANENT
DOCUMENT NO
17976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verificatioit of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> hammerstones and pitted stones.Historic-period materials might include <br /> stone,concrete,or adobe footings and walls;filled wells or privies;and <br /> deposits of metal,glass,and/or ceramic refuse.The project developer <br /> 4.E-2.Cultural Resources(cont.) <br /> shall ensure that a Secretary of the Interior-qualified archaeologist will <br /> inspect the findings within 24 hours of discovery. If the archaeologist <br /> determines that construction activities could damage a historical resource <br /> or a unique archaeological resource(as defined pursuant to the CEQA <br /> Guidelines),mitigation will be implemented in accordance with Public <br /> Resources Code(PRC)Section 21083.2 and Section 15126.4 of the <br /> CEQA Guidelines,with a preference for preservation in place.Consistent <br /> with Section 15126.4(b)(3),this may be accomplished through planning <br /> construction to avoid the resource;incorporating the resource within open <br /> space;capping and covering the resource;or deeding the site into a <br /> permanent conservation easement.If avoidance is not feasible,a <br /> qualified archaeologist will prepare and implement a detailed treatment <br /> plan in consultation with the City.Treatment of unique archaeological <br /> resources shall follow the applicable requirements of PRC Section <br /> 21083.2.Treatment for most resources would consist of(but would not <br /> be not limited to)sample excavation,artifact collection,site <br /> documentation,and historical research,with the aim to target the <br /> recovery of important scientific data contained in the portion(s)of the <br /> significant resource to be impacted by project construction.The treatment <br /> plan will include provisions for analysis of data in a regional context, <br /> reporting of results within a timely manner,curation of artifacts and data <br /> at an approved facility,and dissemination of reports to local and state <br /> repositories,libraries,and interested professionals. <br /> (2012 SEIR)Mitigation Measure 4.D-3: In the event that All Site developer shall train Site developer If resources are encountered, During Verified by: <br /> paleontological resources are encountered during the course of workers and monitor Community verify work is suspended as construction. Date: <br /> development, all construction activity must temporarily cease in the their activities. Development required, review and approve <br /> affected area(s)until the uncovered fossils are properly assessed by a Site developer shall halt Department paleontologist and <br /> qualified paleontologist and subsequent recommendations forwork and hire a paleontologist's <br /> appropriate documentation and conservation are evaluated by thepaleontologist if recommendations. <br /> Lead Agency. Excavation or disturbance may continue in other areas materials are discovered. Inspect site during construction <br /> of the site that are not reasonably suspected to overlie adjacent or to ensure compliance with <br /> additional paleontological resources. Paleontologist shall project construction plans. <br /> conduct independent <br /> review and prepare <br /> treatment plan,if <br /> necessary,and file any <br /> required reports with the <br /> appropriate State <br /> agencies. <br /> Site developer shall <br /> implement treatment <br /> plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.