My WebLink
|
Help
|
About
|
Sign Out
RES 17976
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2017
>
RES 17976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2017 9:31:19 AM
Creation date
11/13/2017 4:40:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/7/2017
DESTRUCT DATE
PERMANENT
DOCUMENT NO
17976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. A substantial increase in the severity of an environmental impact would result <br /> unless mitigation measures are adopted that reduce the impact to a level of <br /> insignificance; <br /> 3. A feasible project alternative or mitigation measure considerably different from <br /> others previously analyzed would clearly lessen the environmental impacts of the <br /> project, but the project's proponents decline to adopt it; or <br /> 4. The draft EIR was so fundamentally and basically inadequate and conclusory in <br /> nature that meaningful public review and comment were precluded. <br /> By comparison, recirculation is not required when new information merely amplifies, <br /> clarifies, or makes insignificant modifications to an adequate EIR (CEQA Guidelines <br /> §15088.5(b)). <br /> B. No Significant New Information has Arisen Since Publication of the <br /> Final SEIR <br /> As discussed below, no information has arisen since the publication of the Final SEIR <br /> that meets the definition of"significant new information" as defined in CEQA Guidelines <br /> Section 15088.5(a). <br /> No significant new information has been added to the Project Description <br /> The City has confirmed that the proposed EDZ, including the anticipated land <br /> development program, has not changed from its description in Chapter 3.0, Project <br /> Description, of the EIR. <br /> No significant new information has been added to the Environmental Setting <br /> Descriptions of existing physical conditions in the area of the EDZ are presented and <br /> described in the SEIR Setting sections for each of the four main environmental topics— <br /> namely, Aesthetics, Air Quality, Noise, and Traffic and Transportation — as well as all <br /> other environmental topics discussed in the document. The discussions of the <br /> environmental setting are based on actual physical conditions as they existed on the <br /> date of publication of the Notice of Preparation for the Draft SEIR (NOP), August 25, <br /> 2014—this date established the baseline for the SEIR. <br /> A visit to the area of the EDZ conducted on April 16, 2017 indicated no substantial <br /> changes to the physical conditions as described in the SEIR have taken place within the <br /> area of the proposed EDZ. The City has confirmed this conclusion. <br /> No significant new information has been added to the Regulatory Setting <br /> Although some changes have taken place, no substantial changes to the regulations, <br /> rules, and plans as described in the SEIR Regulatory Setting discussions have occurred <br /> that would result in significant new information, as discussed below. Specific examples <br /> include: <br /> 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.