My WebLink
|
Help
|
About
|
Sign Out
PC-98-38
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-38
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:01 AM
Creation date
12/17/2003 10:10:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1998
DOCUMENT NO
PC-98-38
DOCUMENT NAME
PUD-98-02
NOTES
ALBERT WILLIAM ESPERSON
NOTES 3
3 SFH LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-98-38 <br /> <br />Page 15 <br /> <br />71. The applicant is responsible for implementing the following measures during all <br />construction phases ofthe project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to storm <br />water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and equipment off paved or graveled areas <br />during wet weather. Broom sweep the street pavement adjoining the project site on a <br />daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />in the storm drain system. Maintain and/or replace filter materials to ensure effectiveness <br />and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown or in <br />the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br />discharge wash water into street, gutters, or storm drains. <br /> <br />Urban Clean Water Run-Off <br /> <br />72. The applicant shall comply with the City's non-point storm water discharge ordinance. <br /> <br />73. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping-- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.