Laserfiche WebLink
<br />Resolution No. PC-98-38 <br />Page 13 <br /> <br />ENGINEERING <br /> <br />56. The developer shall grant an easement to the City over those parcels needed for public <br />service easements (P.S.E.) and which are approved by the City Engineer or other <br />easements which may be designated by the City Engineer. <br /> <br />57. The developer shall install street frontage improvements per Chapter 19.40.010 of the <br />Pleasanton Municipal Code and to the satisfaction of the City Engineer. These <br />improvements may include, but are not necessarily limited to, grading, curb and gutter, <br />sidewalk, paving, storm drain, sanitary sewer, water facilities, street lighting, <br />underground utilities, traffic control devices, landscaping, and automatic irrigation <br />systems. <br /> <br />58. The developer shall construct vertical P.C.C. curbs and gutters within this development <br />unless otherwise approved by the City Engineer. When the sidewalk is adjacent to the <br />curb and gutter, they shall be poured monolithically. <br /> <br />59. The developer shall construct a transit shelter with trash receptacle at a location <br />determined by the Planning Director and the City Engineer. The shelter and trash <br />receptacle design shall be approved by the Planning Director prior to issuance of project <br />building permits. An encroachment permit shall be obtained prior to installation. <br />Lighting shall be provided if determined necessary by the City Engineer. <br /> <br />Grading and Drainage <br /> <br />60. The developer shall submit an erosion and sedimentation control plan or procedure as <br />part of the final grading and/or improvement plans. The applicant is responsible for <br />ensuring that the contractor is aware of and implements such measures. No grading shall <br />occur between October 15 and April 15 unless approved erosion control/storm water <br />quality measures are in place, subject to the approval of the City Engineer/ Director of <br />Building Inspection. Such measures shall be maintained until such time as permanent <br />landscaping is in place. All cut and fill slopes shall be revegetated and stabilized as soon <br />as possible after completion of grading, but in no case later than October 15th. <br />Hydroseeding shall be accomplished before September 15 and irrigated with a temporary <br />irrigation system to ensure that the grasses are established before October 15. <br /> <br />61. The developer shall submit a refundable cash bond for hazard and erosion control prior to <br />issuance of an Engineering or Building Department permit. The amount of this bond will <br />be determined by the City Engineer. <br /> <br />62. The developer shall submit a dust control plan or procedure as part ofthe improvement <br />plans. <br />