My WebLink
|
Help
|
About
|
Sign Out
PC-98-38
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-38
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:01 AM
Creation date
12/17/2003 10:10:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1998
DOCUMENT NO
PC-98-38
DOCUMENT NAME
PUD-98-02
NOTES
ALBERT WILLIAM ESPERSON
NOTES 3
3 SFH LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-98-38 <br />Page 11 <br /> <br />BUILDING <br /> <br />39. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />40. Building and situs plans are to be submitted to the Building Department on computer disk <br />in a format approved by the Director. Digitized information shall be submitted before <br />requesting a final inspection and should reflect as-built situs and architectural information <br />as approved by the Director. <br /> <br />41. All dwelling units in the development shall be constructed to meet Title 24 state energy <br />requirements. <br /> <br />42. The developer shall submit two copies of the site soils report to the Director of Building <br />Inspection for third party peer review and shall pay for such review at the time specified <br />by the Director, but in all cases before the issuance of a grading permit. <br /> <br />43. The soils engineer shall certify the pad compactions of all lots containing fill to the <br />satisfaction of the Director of Building Inspection prior to the issuance of building <br />permits. <br /> <br />44. The developer shall submit plot plans for each of the residential lots showing building <br />setbacks and a topographic plan showing grading and drainage. Pad elevations, finish <br />floor elevations, retaining walls, easements, and maximum height of the highest structure <br />are to be indicated on the plan. Plans for custom lots are to be signed by a registered civil <br />engineer. All residential plot plans shall show compliance with 2907(d) and 700l2(d) of <br />the Uniform Building Code. <br /> <br />45. The developer shall submit record tract grading plans showing: 1) the elevation of all <br />four corners of the lot as well as the center of the lot, 2) all top and toe of slope <br />elevations, and 3) the top and toe of all retaining wall elevations. The record grading plan <br />is to be submitted to the Director of Building Inspection before the first house final. <br /> <br />46. The paving sections for the on-site parking and drive areas shall be designed on the basis <br />of an R-Value test and a traffic index to carry the anticipated traffic loads. This design <br />shall be subject to the approval of the Director of Building Inspection. The minimum <br />paving section shall be 2" AC. on 6" of AB. The minimum AC. pavement slope shall <br />be 1%. For pavement slopes of less than I %, the surface runoff shall be carried in a <br />concrete gutter to an acceptable point of discharge. The minimum slope for concrete <br />gutter shall be 0.5%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.