Laserfiche WebLink
<br />Resolution No. PC-98-36 <br />Page 13 <br /> <br />75. The applicants shall install structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City Engineer/Director of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be cleaned at <br />least twice a year: once immediately prior to October I and once in January. The <br />applicants shall enter into a maintenance agreement for the oil/water separator with the <br />City. <br /> <br />76. The applicants shall label all on-site storm drain inlets with the wording, "No Dumping -- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />{end} <br />