My WebLink
|
Help
|
About
|
Sign Out
PC-98-31
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:00 AM
Creation date
12/16/2003 11:40:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/29/1998
DOCUMENT NO
PC-98-31
DOCUMENT NAME
EIR HAPPY VALLEY
NOTES
CITY OF PLEASANTON
NOTES 3
APPROVAL OF EIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />17. Removal of aboveground or underground fuel tanks is required in accordance with the require- <br />ments .of the Livermore-Pleasanton Fire Departtnent, if these are to be removed as part of devel- <br />opment under the Specific Plan. <br /> <br />Timing: <br /> <br />Prior to commencement of development activity on each applicable site. <br /> <br />I8. Demolition of structures is required in accordance with applicable requirements of the California <br />Departtnent of Industrial Relations (Cal/OSHA)3 for lead, with appropriate follow-up measures if <br />lead-based paint is found. <br /> <br />Timing: <br /> <br />In conjunction with and following development activity on each applicable site. <br /> <br />I9. Demolition of structures is required in accordance with the requirements of CallOSHA and the Bay <br />Area Air Quality Management District (BAAQMD) for asbestos, with appropriate follow-up meas- <br />ures if asbestos is found. <br /> <br />Timing: <br /> <br />In conjunction with and following development activity on each applicable site. <br /> <br />Il O. Notification of the Underground Service Alert (USA) as well as site tenants is required prior to <br />groundbreaking, to obtain information on the existing location of underground utilities. <br /> <br />Timing: <br /> <br />Prior to groundbreaking on each development site. <br /> <br />Ill. Contact with the Alameda County Mosquito Abatement District is required for assistance in con- <br />trolling and managing potential disease-bearing vectors and their breeding areas (e.g., lakes. <br />detention basins, springs), to reduce the potential for transmission of public health diseases associ- <br />ated with these organisms. <br /> <br />Timing: <br /> <br />Prior to issuance of a grading permit on each applicable site. <br /> <br />J. BIOLOGY <br /> <br />Requirements of the Specific Plan <br /> <br />JI. A Califomia Tiger Salamander Mitigation and Monitoring Plan must be prepared and submitted to <br />the California Depanment ofFish and Game (DFG) for review and approval. Approval of the plan <br />must be obtained from DFG. <br /> <br />Timing: <br /> <br />Prior to the issuance of any grading permits that affect tiger salamander habitat. <br /> <br />3 <br /> <br />The California Occupational Health and Safety Act (Cal/OSHA) is administered by the State Department of <br />Industrial Relations, Division of Occupational Health and Safety. <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.