Laserfiche WebLink
<br />B5. Emergency vehicle access routes (EV As) are to be added at the Golf Course, Laura Lane, Mock- <br />ingbird Lane/East Mockingbird Lane, and Spotorno Flat area. <br /> <br />Timing: <br /> <br />Golf Course EVA prior to opening of the Golf Course. Laura Lane EVA prior to occu- <br />pancy of the first new home following subdivision of Lot 63. Mockingbird Lane/East <br />Mockingbird Lane EVA to be determined through the City's Capital Improvement <br />Program. Spotorno Flat EVA prior to occupancy of first new home following subdivi- <br />sion of the Spotorno Flat area. <br /> <br />B6. Construction vehicles en route to development sites on the Spotorno Property, including both the <br />Spotorno Upper Valley Area and the Spotomo Flat Area, may use only the Bypass Road. A series <br />of specified alternative routes, appropriate to different conditions, for construction vehicles en <br />route to the Golf Course and Golf Course Housing areas, are also specified in the Plan. <br /> <br />Timing: <br /> <br />c. NOISE <br /> <br />During construction. <br /> <br />CI. Any pump station in the Happy Valley must be situated and designed so that pump noise level will <br />not exceed 50 dBA at the property line or boundary of the easement of the pump site. <br /> <br />Timing: <br /> <br />When water and sewer systems are designed and built. <br /> <br />C2. The use of gasoline-powered golf carts is prohibited. <br /> <br />Timing: <br /> <br />During Golf Course operations. <br /> <br />C3. If the Golf Course clubhouse has a public address system (e.g., for calling golf parties to the first <br />tee), then the system must have volume control and must be operated at a volume that is not audi- <br />ble at the nearest residence. <br /> <br />Timing: <br /> <br />During Golf Course operations. <br /> <br />C4. Construction activity is limited to the hours of 8:00 AM to 5:00 PM, Monday through Saturday. <br />(Same as ReqUlremenl A4.) <br /> <br />Timing: <br /> <br />During construction. <br /> <br />D. AIR QUALITY <br /> <br />DI. During the construction period, all active unpaved construction areas (residential, Golf Course, roads. <br />and infrastructure) shall be watered as needed, or treated with soil stabilizers, in order to avoid dust, <br />and exposed stockpiles of dirt or sand shall be enclosed, covered, or treated with dust-preventives. <br /> <br />Timing: <br /> <br />During grading and construction. <br /> <br />7 <br />