Laserfiche WebLink
<br />b. The curb return radius on shall be twenty-five feet (25' 0") measured to the <br />face-of-curb. <br /> <br />These changes shall be shown on the tentative subdivision map. <br /> <br />75. All proposed property grading shall be constructed above the 100-Year flood plain. <br />The project developer shall process through FEMA a request for "Letter of Map <br />Revision" (LOMR). The project developer shall provide a conditional letter of <br />Map Revision from FEMA to the City Engineer prior to approval of the Final <br />Map. <br /> <br />76. Top of curb grades shall be equal or higher than the lOO-Year flood elevation, as <br />approved by Zone 7 for the widened Arroyo Mocho charmel. <br /> <br />77. Prior to occupancy of units, the project developer shall supply the City with a <br />LOMR from FEMA. <br /> <br />78. The developer shall extend the Arroyo Mocho to its ultimate width along the pro- <br />ject northerly boundary, and as necessary to allow construction above the <br />100- Y ear flood plain. These improvements shall be constructed to Zone 7 stan- <br />dards. The project developer shall acquire all land necessary to construct these <br />improvements from the adjacent properties. <br /> <br />79. The soundwall along Stoneridge Drive, shall be located on private property and be <br />maintained by the homeowners' association. <br /> <br />80. The project developer's engineer shall demonstrate to the City Engineer that sani- <br />tary sewer main will not be required along the northerly boundary of the develop- <br />ment to allow the sanitary sewer to flow by gravity. If a sanitary sewer main is <br />required along the north boundary sufficient lots shall be removed to allow a street <br />to be installed between the two loop streets. This revision, if required, shall be <br />shown on the tentative map for review and approval by the PI arming Commission. <br /> <br />Urban Stormwater Runoff Requirements: <br /> <br />81. The project developer shall label all public street storm drain inlets with the word- <br />ing, "No Dumping -- Drains to Bay" using City-approved methods and materials. <br /> <br />Exhibit "B", Conditions of Approval <br />Case PUD-91-11-3M <br /> <br />April 22. 1998 <br />Page 13 of 15 <br />