Laserfiche WebLink
<br />Resolution No. PC-98-21 <br />Page 17 <br /> <br />61. The storm water inlet structure near Lot 2 shall have a overland spillway onto the private <br />driveway. The private driveway shall be designed to carry this flow. <br /> <br />62. The proposed fill slopes on Lots 4 and 5 shall have a maximum slope of 3: I unless <br />otherwise approved by the City Engineer. <br /> <br />63. The storm water runoff from each of the lots shall be directed to the public street or other <br />approved storm drain collection system unless otherwise approved by the Building <br />Official and City Engineer. <br /> <br />64. The applicant's engineer shall verify whether the capacity ofthe storm drain swale along <br />the northerly property line and the existing culverts under Foothill Road are adequate to <br />handle the stormwater runoff from the site. The applicant shall mitigate any stormwater <br />problems associated with this development to the satisfaction ofthe City Engineer prior <br />to the approval of the tentative map. <br /> <br />65. The owners ofthe Lots 2, 3, 5, and 6 shall be notified that they will have to acconunodate <br />drainage from the uphill area of the ridge as part of their individual lot drainage plan. <br />Specific reference to these requirements shall be made in the deed for each lot. <br /> <br />66. The applicant shall improve Foothill Road along the project frontage to the satisfaction of <br />the City Engineer. These improvements shall include but not limited to constructing two <br />13 foot travel lanes, two 6 foot bike lanes and 5 foot wide area behind the western curb <br />graded at a 2 percent towards the street. At the intersection of Foothill Road and the <br />proposed entrance street to the project an additional 12 foot left turn lane and right turn <br />deceleration lane shall be added, along with any necessary transition. The applicant shall <br />dedicate a 8 foot wide public service easement behind the curb of the project street. There <br />shall be no driveway access from the individual lots onto Foothill Road. The developer <br />shall determine the structural section of the existing Foothill Road. If the existing street <br />section is not adequate for the anticipated traffic demand, the street shall be reconstructed. <br />If the street section is adequate, the street shall be overlayed with a minimum of I 1/2 <br />inches of asphalt with fabric. These improvements shall be shown on the tentative map. <br />The applicant may enter into a reimbursement agreement with the City to recover some of <br />the costs of these improvements from other benefiting properties when they develop their <br />properties. <br /> <br />67. All proposed V -ditches shall be constructed of concrete. <br /> <br />68. Any fill slopes over 25 ft. in height shall be monitored for one year before construction is <br />allowed to proceed on the surface. <br />