My WebLink
|
Help
|
About
|
Sign Out
PC-98-21
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:00 AM
Creation date
12/16/2003 10:10:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/25/1998
DOCUMENT NO
PC-98-21
DOCUMENT NAME
PUD-98-01
NOTES
DONG YU REAL ESTATE DEVTE
NOTES 3
6 LOT CUSTOM HOME DEVT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-98-21 <br />Page 17 <br /> <br />61. The storm water inlet structure near Lot 2 shall have a overland spillway onto the private <br />driveway. The private driveway shall be designed to carry this flow. <br /> <br />62. The proposed fill slopes on Lots 4 and 5 shall have a maximum slope of 3: I unless <br />otherwise approved by the City Engineer. <br /> <br />63. The storm water runoff from each of the lots shall be directed to the public street or other <br />approved storm drain collection system unless otherwise approved by the Building <br />Official and City Engineer. <br /> <br />64. The applicant's engineer shall verify whether the capacity ofthe storm drain swale along <br />the northerly property line and the existing culverts under Foothill Road are adequate to <br />handle the stormwater runoff from the site. The applicant shall mitigate any stormwater <br />problems associated with this development to the satisfaction ofthe City Engineer prior <br />to the approval of the tentative map. <br /> <br />65. The owners ofthe Lots 2, 3, 5, and 6 shall be notified that they will have to acconunodate <br />drainage from the uphill area of the ridge as part of their individual lot drainage plan. <br />Specific reference to these requirements shall be made in the deed for each lot. <br /> <br />66. The applicant shall improve Foothill Road along the project frontage to the satisfaction of <br />the City Engineer. These improvements shall include but not limited to constructing two <br />13 foot travel lanes, two 6 foot bike lanes and 5 foot wide area behind the western curb <br />graded at a 2 percent towards the street. At the intersection of Foothill Road and the <br />proposed entrance street to the project an additional 12 foot left turn lane and right turn <br />deceleration lane shall be added, along with any necessary transition. The applicant shall <br />dedicate a 8 foot wide public service easement behind the curb of the project street. There <br />shall be no driveway access from the individual lots onto Foothill Road. The developer <br />shall determine the structural section of the existing Foothill Road. If the existing street <br />section is not adequate for the anticipated traffic demand, the street shall be reconstructed. <br />If the street section is adequate, the street shall be overlayed with a minimum of I 1/2 <br />inches of asphalt with fabric. These improvements shall be shown on the tentative map. <br />The applicant may enter into a reimbursement agreement with the City to recover some of <br />the costs of these improvements from other benefiting properties when they develop their <br />properties. <br /> <br />67. All proposed V -ditches shall be constructed of concrete. <br /> <br />68. Any fill slopes over 25 ft. in height shall be monitored for one year before construction is <br />allowed to proceed on the surface. <br />
The URL can be used to link to this page
Your browser does not support the video tag.