My WebLink
|
Help
|
About
|
Sign Out
PC-98-12
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:58 AM
Creation date
12/10/2003 3:40:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/25/1998
DOCUMENT NO
PC-98-12
DOCUMENT NAME
Z-97-310
NOTES
DANIEL DANIELSON
NOTES 3
ADD ST.ELIZABETH SETON,PARK LOT EXPANSION
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-98-12 <br />Page 12 <br /> <br />On-Site Operations <br /> <br />63. All existing wells on the site shall be removed or sealed, filled and abandoned pursuant to <br />Alameda County Ordinance 73-68, prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for construction water. Any wells <br />designated for abandomnent or any wells, encountered during construction, are to be <br />destroyed in accordance with a permit obtained from Zone 7. <br /> <br />64. All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br />abandoned, pursuant to the requirements of the Alameda County Department of Health <br />Services. <br /> <br />65. The developer's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. <br /> <br />66. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br /> <br />67. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />68. The applicant shall submit a construction Best Management Practices (BMP's) program <br />for review and approval by the Planning Director prior to issuance of building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />69. The applicant is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to storm <br />water runoff pollution. <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and equipment off paved or graveled areas <br />during wet weather. Broom sweep the street pavement adjoining the project site on a <br />daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.