My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
110717
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 11:39:33 AM
Creation date
11/1/2017 11:12:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/7/2017
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Site(s) Affected: The mitigation measures are, in some cases, site specific. This column <br />identifies which specific sites would need to adhere to the mitigation measure, or if the <br />measure addresses all sites. <br />• Implementation Procedures: This column identifies the procedures associated with <br />implementation of the migration measure. <br />• Monitoring Responsibility: This column contains an assignment of responsibility for the <br />monitoring and reporting tasks. <br />• Monitoring and Reporting Action: This column refers the outcome from implementing <br />the mitigation measure. <br />• Mitigation Schedule: The general schedule for conducting each mitigation task, <br />identifying where appropriate both the timing and the frequency of the action. <br />• Verification of Compliance: This column may be used by the lead agency to document <br />the person who verified the implementation of the mitigation measure and the date on <br />which this verification occurred. <br />6.3 Enforcement <br />If the EDZ is approved, the MM RP would be incorporated as a condition of such approval. <br />Therefore, all mitigation measures for significant impacts must be carried out in order to fulfill <br />the requirements of approval. A number of the mitigation measures would be implemented during <br />the course of the development review process. These measures would be checked on plans, in <br />reports, and in the field prior to construction. Most of the remaining mitigation measures would <br />be implemented during the construction or EDZ implementation phase. <br />71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.