My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
110717
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 11:39:33 AM
Creation date
11/1/2017 11:12:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/7/2017
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT OBJECTIVES <br />The objectives of the proposed JDEDZ and associated General Plan amendment and <br />PUD Rezoning are to: <br />▪ Provide a consistent framework for the City's review and approval of new uses and <br />projects in the JDEDZ area, encouraging investment in and adding value to these <br />properties; <br />® Maximize the benefits of the location of the JDEDZ project area as an infill site <br />located along transportation corridors and near transit by encouraging the <br />development of both locally and regionally accessible uses in the JDEDZ project <br />area; and <br />• Encourage the development of a diverse mix of uses in the City that would promote <br />long-term economic growth by generating substantial new revenues for the City. <br />PROPOSED PROJECT <br />The JDEDZ entails the implementation of rules, regulations/review processes, and <br />design guidelines (Attachment 4, Exhibit B) to facilitate future development and <br />redevelopment within the JDEDZ project area. As part of the proposed JDEDZ, the City <br />would also specify fees and fee credits for prospective uses and specify off-site <br />improvements. <br />The mix of uses expected to occur within the JDEDZ project area with full buildout <br />includes club retail (also known as warehouse club), hotel, recreational facilities, and <br />general retail establishments. Existing uses within the JDEDZ project area would be <br />"grandfathered" and operate and/or be permitted to expand until redevelopment <br />activities are proposed for a specific parcel within the project area. <br />With development of the JDEDZ, the project area could contain up to 535,490 square <br />feet of occupied building space, a net increase of 310,802 square feet over the existing <br />occupied buildings within the JDEDZ project area. It is assumed that development of the <br />JDEDZ project area would occur in two or more phases, including an initial phase <br />(Phase I) during which Parcels 6, 9 and 10 would be developed with hotel(s) <br />(231 rooms), club retail (148,000 square feet), and general retail (5,000 square feet) <br />uses. <br />The afore -mentioned design guidelines include both broad brush design policies, as <br />well as very specific development criteria. For example, the Design Guidelines would: <br />• Establish site development standards such as setbacks, floor area ratio, and height <br />• Create site design and circulation standards; <br />• Create architectural design standards specifying things such as materials, finishes, <br />and colors; <br />• Create landscape standards such as street buffers, parking lot shading, etc.; and <br />• Require a master sign program for each new development. <br />Page 5 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.