Laserfiche WebLink
0 <br />0 <br />in <br />m. <br />2 <br />•0 <br />co <br />CZ <br />(0 <br />0 <br />0 <br />m <br />ui <br />v <br />m <br />G <br />co co <br />O <br />v <br />m <br />G - <br />0 CO <br />O <br />7 0 N <br />.CD En 0. <br />�O a C O <br />O p) j L <br />aoa3 <br />o=� - w <br />=_ <br />c 0 N 13 C <br />N C a N va) <br />rO a Cf a) C2 <br />,0).—„, <br />O 7-C d .7 O <br />ao.3 it- aU <br />Community Development <br />Department: Review and approval <br />of wetland ecologist. <br />RWQCB/USACE: Review, verify <br />wetland delineation. <br />Community Development <br />Department/Caltrans: Review and <br />approval of construction plan. <br />Community Development <br />Department/Caltrans: Inspect site <br />during construction to ensure <br />compliance with project <br />construction plans. <br />Review and approve project <br />specifications and grading and <br />construction plans for inclusion <br />of this measure in specifications. <br />Inspect site during construction <br />to ensure compliance with <br />project construction plans. <br />N <br />om EL <br />m o m U o <br />o — <br />o>D:.E <br />i co ` �Ucr € cu1 0 aE <br />a" cEci. LL O- -0 Q •.59. E N A <br />r=. <br />C CO co 7 p co W co O N N <br />U) O CnmOm j15— OQO <br />tli <br />a c <br />o E <br />'0 <br />ai =,°- E <br />a O N m <br />O O N N <br />co ()co <br />0) <br />L Ira' <br />N •M 7 C0 <br />-cu, 'O) N -O ' <br />yo�o)C <br />U U <br />O y C p Ti, <br />0 a a a <br />N CO 1] 7 C CD ;12 <br />al) N O <br />m3a)y0 <br />CO Na E 3 <br />co C <br />0 O N EL...) <br />U ,Z` 3 D `O N <br />2c-0=-omE <br />co N N a 7 C N 13.) <br />O Q C v c g c E o. <br />N a+ {9 N r sR C E <br />N! «t. a_ C N <br />c �; co '0 <br />a O. — a y =_ <br />�2md0>2.co <br />c <br />CO O. CI N CO o. LN <br />C C <br />O N <br />N 6:02a D y <br />CL f0 f00 "'N <br />a a a m <br />Cl- x n <br />d y <br />C <br />L C V <br />N N N <br />N'.= C <br />N co N CO <br />-) a y <br />u) -o <br />< c 0 <br />Removal of structures containing or suspected to contain potential bat <br />roosting habitat or active bat roosts shall be dismantled under the <br />supervision of the qualified biologist in the evening and after bats have <br />emerged from the roost to forage. Structures shall be partially <br />dismantled to significantly change the roost conditions, causing bats <br />to abandon and not return to the roost. <br />Mitigation Measure 4.E-2: Wetland Delineation. In coordination with <br />the City, a qualified wetland ecologist shall conduct a wetland <br />delineation of the proposed bridge expansion and replacement site to <br />identify potential waters of the United States (U.S.) (including wetlands) <br />or waters of the state which may be present. If no waters of the U.S. or <br />waters of the state are identified onsite, no further action is required. <br />Should waters of the U.S. or waters of the state be determined present <br />within the site, features shall be mapped and documented in a report for <br />submission to the appropriate jurisdictional agencies retaining authority <br />over the identified features. <br />Mitigation Measure 4.E-3: Wetland Avoidance and Protection. <br />Access roads, work areas, and infrastructure shall be sited to avoid <br />and minimize direct and indirect impacts to wetlands and waters. <br />Where work will occur within and/or adjacent to federal and state <br />jurisdictional wetlands and waters, protection measures shall be <br />applied to minimize the footprint of overall impacts and protect these <br />features. These measures shall include the following: <br />• A protective barrier (such as silt fencing) shall be erected around <br />the work area (s) to minimize disturbance to wetland or water <br />features•and isolate adjacent to wetland or water features from <br />construction activities to reduce the potential for incidental fill, <br />erosion, or other disturbance beyond what is necessary for bridge <br />expansion and replacement; <br />• Signage shall be installed on the fencing to identify sensitive <br />habitat areas and restrict construction activities; <br />• No equipment mobilization, grading, clearing, or storage of <br />