WHEREAS, cities and counties own and operate more than 81 percent of streets and
<br /> roads in California, and from the moment we open our front door to drive to work, bike to school,
<br /> or walk to the bus station, people are dependent upon a safe, reliable local transportation
<br /> network, and
<br /> WHEREAS, modernizing the local street and road system provides well-paying
<br /> construction jobs and boosts local economies, and
<br /> WHEREAS, the local street and road system is also critical for farm to market needs,
<br /> interconnectivity, multimodal needs, and commerce, and
<br /> WHEREAS, police, fire, and emergency medical services all need safe reliable roads to
<br /> react quickly to emergency calls and a few minutes of delay can be a matter of life and death,
<br /> and
<br /> WHEREAS, maintaining and preserving the local street and road system in good
<br /> condition will reduce drive times and traffic congestion, improve bicycle safety, and make the
<br /> pedestrian experience safer and more appealing, which leads to reduce vehicle emissions
<br /> helping the State achieve its air quality and greenhouse gas emissions reductions goals, and
<br /> WHEREAS, restoring roads before they fail also reduces construction time which results
<br /> in less air pollution from heavy equipment and less water pollution from site run-off, and
<br /> WHEREAS, the SB 1 project list and overall investment in our local streets and roads
<br /> infrastructure with a focus on basic maintenance and safety, investing in complete streets
<br /> infrastructure, and using cutting-edge technology, materials and practices, will have significant
<br /> positive co-benefits statewide
<br /> NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City
<br /> Council of the City of Pleasanton, State of California, as follows
<br /> SECTION 1 The foregoing recitals are true and correct
<br /> SECTION 2 The streets budget for fiscal year 2017-18 incorporates the following list
<br /> of projects planned to be funded with Road Maintenance and Rehabilitation Account revenues
<br /> Annual Resurfacing and Reconstruction of Various Streets, CIP 17503 The project will
<br /> resurface various streets throughout the City in the summer of 2018, including but not limited to
<br /> Main Street/Santa Rita (from Bernal Avenue to Amador High School), Foothill Road (from 1-580
<br /> to Muirwood), Muirwood Drive North (from Foothill to W Las Positas) and various courts off
<br /> Muirwood, Johnson Drive (from Owens Drive to Commerce Drive), Stoneridge Drive around
<br /> Gibraltar, Various streets in County Fair Estates, off of Paseo Santa Cruz (north), Various
<br /> streets in Val Vista, off of Single Tree, Payne, Alvord, and Inglewood The resurfacing
<br /> treatments will extend the useful life of the roadway an additional 10 to 15 years
<br /> PASSED APPROVED AND ADOPTED by the City Council of the City of Pleasanton,
<br /> State of California at a regular meeting held on October 17, 2017
<br />
|