My WebLink
|
Help
|
About
|
Sign Out
ORD 2168
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:26 PM
Creation date
10/13/2017 3:47:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/19/2017
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2168
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
include erosion control measures on the final grading plan, subject to the approval <br /> of the City Engineer. Such measures shall be maintained until such time as a <br /> permanent landscaping is in place. <br /> 58. Storm drainage swales, gutters, inlets, and channels shall be privately maintained <br /> by the property owner. <br /> 59. The haul route for all materials to and from this development shall be approved by <br /> the City Engineer prior to the issuance of the building permit. <br /> 60. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the project developer. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> 61. Plans submitted for plan check shall include all plant materials within the bioswale <br /> areas to be in compliance with Alameda County Clean Water Program's "C.3 <br /> Stormwater Technical Guidance, Appendix B" dated May 2, 2016, version 5.1. <br /> Building and Safety Division <br /> 62. At the time of building permit plan submittal, the project developer shall submit a <br /> final grading and drainage plan prepared by a licensed civil engineer depicting all <br /> final grades and on-site drainage control measures to prevent stormwater runoff <br /> onto adjoining properties. <br /> 63. Prior to issuance of building or demolition permits, the applicant shall submit a <br /> waste management plan to the Building and Safety Division. The plan shall include <br /> the estimated composition and quantities of waste to be generated and indicate <br /> how the project developer intends to recycle at least 75 percent of the total job site <br /> construction and demolition waste measured by weight or volume. Proof of <br /> compliance shall be provided to the Chief Building Official prior to the issuance of <br /> a final building permit. During demolition and construction, the project developer <br /> shall mark all trash disposal bins "trash materials only" and all recycling bins <br /> "recycling materials only." The project developer shall contact Pleasanton <br /> Garbage Service for the disposal of all waste from the site. <br /> Community Development Department <br /> 64. The project applicant/developer shall submit a refundable cash bond for hazard <br /> and erosion control. The amount of this bond will be determined by the Director of <br /> Community Development. The cash bond will be retained by the City until all the <br /> permanent landscaping is installed for the development, including individual lots, <br /> unless otherwise approved by the department. <br /> 65. The project developer shall pay any and all fees to which the property may be <br /> subject prior to issuance of permits. The type and amount of the fees shall be <br /> those in effect at the time the permit is issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.