My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
101717
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2017 3:34:43 PM
Creation date
10/12/2017 10:14:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2017
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> SB 1, the Road Repair and Accountability Act of 2017, was passed by the Legislature <br /> and signed into law by the Governor in April 2017 in order to address the significant <br /> multi-modal transportation funding shortfalls statewide. <br /> The City must pass a resolution that includes a list of all projects proposed to be funded <br /> from the RMRA. The list must include a description and the location of each proposed <br /> project, a proposed schedule for the project's completion, and an estimate of the useful <br /> life of the improvements. <br /> DISCUSSION <br /> The City programed SB 1 funding into the 2017/18 Streets CIP under Annual <br /> Resurfacing and Reconstruction of Various Streets, CIP No. 17503. The project will <br /> resurface various streets throughout the City in the summer of 2018, including but not <br /> limited to: Main Street/Santa Rita (from Bernal Avenue to Amador High School); Foothill <br /> Road (from 1-580 to Muirwood); Muirwood Drive North (from Foothill to W. Las Positas) <br /> and various courts off Muirwood; Johnson Drive (from Owens Drive to Commerce <br /> Drive); Stoneridge Drive around Gibraltar; various streets in County Fair Estates, off of <br /> Paseo Santa Cruz (north); and various streets in Val Vista, off of Single Tree, Payne, <br /> Alvord, and Inglewood. The project will be completed by the fall of 2018. The <br /> resurfacing treatments will extend the useful life of the treated roadway an additional 10 <br /> to 15 years. <br /> SB 1 funding and overall investment in our local streets and roads infrastructure with a <br /> focus on basic maintenance and safety, investing in complete streets infrastructure, and <br /> using cutting-edge technology, materials and practices, will have significant positive <br /> benefits statewide. <br /> Submitted by: Fiscal Review: Approved by: <br /> 6tkVftex <br /> Stephen kSikpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Resolution <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.