My WebLink
|
Help
|
About
|
Sign Out
ORD 1777
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
6/15/1999 8:20:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1777
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
addressed. Failure to comply with the approved construction BMP may result in <br /> the issuance of correction notices, citations, or a stop work order. <br /> <br />64. The applicant is responsible for implementing the following measures during all <br /> construction phases of the project: <br /> <br /> a. Gather all construction debris on a regular basis and place it in a dumpster <br /> or other container which is emptied or removed an a weekly basis. When <br /> appropriate, use tarps on the ground to collect fallen debris or splatters that <br /> could contribute to storm water runoff pollution. <br /> <br /> b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked-on mud and dirt from these areas before sweeping. <br /> <br /> c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding. <br /> <br /> d. Create a contained and covered area on the site for the storage of bags, <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br /> that have the potential of being discharged into the storm drain system <br /> through being windblown or in the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br /> street, gutter, or storm drain. <br /> <br /> f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br /> not discharge wash water into street, gutters, or storm drains. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.