Yolanda Court Outfall Structure Repair, CIP 17434
<br />Bid Summary (September 1, 2017)
<br />W
<br />CCLL
<br />DMZ Builders
<br />Engineers Estimate
<br />9
<br />REM
<br />Z 9
<br />Q.
<br />d
<br />cc
<br />Total
<br />in
<br />Z
<br />v
<br />Total
<br />Total
<br />A.
<br />Total
<br />1
<br />Water Pollution Control
<br />LS
<br />1
<br />$ 15,000.00
<br />$ 15,000.00
<br />2
<br />Clearing and Grubbing
<br />LS
<br />1
<br />$ 10,000.00
<br />$ 10,000.00
<br />3
<br />Temporary Fence (Type ESA)
<br />LF
<br />1300
<br />$ 500
<br />$ 6,500.00
<br />4
<br />Temporary Fence (Type CL -6)
<br />LF
<br />130
<br />$15.00
<br />$ 1,950.00
<br />5
<br />Adjust Manhole to Grade
<br />LS
<br />1
<br />$ 10,000.00
<br />$ 10,000.00
<br />6
<br />Hydroseed
<br />SY
<br />2800
<br />$ 500
<br />$ 14,000.00
<br />7
<br />Erosion Control Product
<br />SY
<br />100
<br />$ 75.00
<br />$ 7,500.00
<br />$ 12,000.00
<br />(Netting)
<br />10,000 00
<br />$ 10,000 00
<br />$
<br />12,448 00
<br />8
<br />Excavation
<br />LS
<br />1
<br />$ 35,000.00
<br />$ 35,000.00
<br />9
<br />Borrow -Import
<br />CY
<br />280
<br />$ 11000
<br />$ 30,80000
<br />30
<br />Slurry Cement Backfill
<br />CY
<br />2
<br />$ 2,500.00
<br />$ 5,000.00
<br />11
<br />Install 36" FPVC Pipe
<br />LS
<br />1
<br />$ 30,000 00
<br />$ 30,000 00
<br />12
<br />Pipe Anchor
<br />EA
<br />2
<br />$ 5,00000
<br />$ 10,00000
<br />13
<br />Rock Slope Protection (Class
<br />TON
<br />50
<br />$ 50000
<br />$ 25,00000
<br />$ 14,000.00
<br />II, Method A)
<br />18270
<br />$ 51,156.00
<br />$ 3,000.00
<br />$ 6,000.00
<br />ATTACHMENT 2
<br />ELLA
<br />W
<br />CCLL
<br />DMZ Builders
<br />Trinet Construction Inc.
<br />D -Line Constructors Inc.
<br />EE Gilbert Construction Inc.
<br />Z 9
<br />Q.
<br />Total
<br />Z u
<br />a
<br />Total
<br />Total
<br />Z
<br />v
<br />Total
<br />Total
<br />Z LJ
<br />a
<br />Total
<br />$ 500.00
<br />$ 500.00
<br />$ 32,000.00
<br />$ 32,000 00
<br />$
<br />50,000 00
<br />$ 50,000 00
<br />$
<br />12,885.00
<br />$ 12,885.00
<br />$ 25,000.00
<br />$ 25,000.00
<br />$ 28,000.00
<br />$ 28,000.00
<br />$ 40,000.00
<br />$ 40,000 00
<br />$
<br />41,256 00
<br />$ 41,256 00
<br />$ 4.00
<br />$ 5,200.00
<br />$ 1600
<br />$ 20,800.00
<br />$
<br />5.00
<br />$ 6,50000
<br />$
<br />421
<br />$ 5,473.00
<br />$ 50.00
<br />$ 6,500.00
<br />$ 100.00
<br />$ 13,000.00
<br />$
<br />10.00
<br />$ 1,300.00
<br />$
<br />2150
<br />$ 2,79500
<br />$ 10,000 00
<br />$ 10,000.00
<br />$ 12,000.00
<br />$ 12,000.00
<br />$
<br />10,000 00
<br />$ 10,000 00
<br />$
<br />12,448 00
<br />$ 12,448.00
<br />$ 2.00
<br />$ 5,600.00
<br />$ 9.50
<br />$ 26,600.00
<br />$
<br />3.00
<br />$ 8,400.00
<br />$
<br />166
<br />$ 4,648.00
<br />$ 25.00
<br />$ 2,500.00
<br />$ 2800
<br />$ 2,800.00
<br />$
<br />30.00
<br />$ 3,00000
<br />$
<br />2802
<br />$ 2,80200
<br />$ 64,000.00
<br />$ 64,000.00
<br />$ 43,000 00
<br />$ 43,000.00
<br />$
<br />95,800.00
<br />$ 95,800 00
<br />$ 114,892 00
<br />$ 114,892 00
<br />$ 5000
<br />$ 14,000.00
<br />$ 100.00
<br />$ 28,000.00
<br />$
<br />50.00
<br />$ 14,000.00
<br />$
<br />18270
<br />$ 51,156.00
<br />$ 3,000.00
<br />$ 6,000.00
<br />$ 6,00000
<br />$ 12,000.00
<br />$
<br />2,000.00
<br />$ 4,000.00
<br />$
<br />2,77500
<br />$ 5,550.00
<br />$ 20,000.00
<br />$ 20,000 00
<br />$ 90,000.00
<br />$ 90,000.00
<br />$
<br />53,363 00
<br />$ 53,363.00
<br />$
<br />17,915.00
<br />$ 17,915.00
<br />$ 15,000 00
<br />$ 30,000.00
<br />$ 6,00000
<br />$ 12,000.00
<br />$
<br />5,000.00
<br />$ 10,000.00
<br />$
<br />5,845.00
<br />$ 11,690.00
<br />$ 100.00
<br />$ 5,000 00
<br />$ 250 00
<br />$ 12,500 00
<br />$
<br />20000
<br />$ 10,000 00
<br />$
<br />335.12
<br />$ 16,756 00
<br />TOTAL $ 200,750.00 $ 194,300 00 $ 332,700.00 $ 306,363 00 $ 300,266 00
<br />Subconsultants: Subconsultants, Subconsultants: Subconsultants
<br />Green Growth Superior Hydroseeding, Inc. Superior Hydroseeding Inc. Freelun Hydroseeding
<br />Bid Summary (September 1, 2017) cont.
<br />W
<br />CCLL
<br />Total
<br />Trinet Construction Inc.
<br />Caxadoro Construction Inc.
<br />O
<br />c
<br />REM
<br />$ 500
<br />6
<br />I= W
<br />�
<br />Total
<br />$ 16,500.00
<br />J= W
<br />Total
<br />m
<br />$ 22300
<br />$ 22,300.00
<br />$ 54,880.00
<br />� rl
<br />$ 92 50
<br />$ 25,900.00
<br />3 6
<br />$ 3,800.00
<br />1
<br />Water Pollution Control
<br />LS
<br />1
<br />$ 10,000 00
<br />$ 10,000.00
<br />$
<br />8,000.00
<br />$ 8,000.00
<br />2
<br />Clearing and Grubbing
<br />LS
<br />1
<br />$ 80,00000
<br />$ 80,000.00
<br />$
<br />9,200.00
<br />$ 9,200.00
<br />3
<br />Temporary Fence (Type ESA)
<br />LF
<br />1300
<br />$ 100
<br />5 1,300.00
<br />$
<br />1000
<br />$ 13,000.00
<br />4
<br />Temporary Fence (Type CL -6)
<br />LF
<br />130
<br />$ 1000
<br />$ 1,300.00
<br />$
<br />9500
<br />$ 12,350.00
<br />5
<br />Adjust Manhole to Grade
<br />LS
<br />1
<br />$ 2,00000
<br />$ 2,000.00
<br />$
<br />2,100.00
<br />$ 2,100.00
<br />6
<br />Hydroseed
<br />SY
<br />2800
<br />$ 2,00
<br />$ 5,600.00
<br />$
<br />3.00
<br />$ 8,400.00
<br />Erosion Control Product
<br />7
<br />(Netting)
<br />SY
<br />100
<br />$ 100.00
<br />$ 10,000.00
<br />$
<br />5200
<br />$ 5,200.00
<br />8
<br />Excavation
<br />LS
<br />1
<br />$ 90,000.00
<br />$ 90,000.00
<br />$
<br />68,000.00
<br />$ 68,000.00
<br />9
<br />Borrow -Import
<br />CY
<br />280
<br />$ 4000
<br />$ 11,200.00
<br />$
<br />11000
<br />$ 30,800.00
<br />30
<br />Slurry Cement Backfill
<br />CV
<br />2
<br />$ 750.00
<br />$ 1,500.00
<br />$
<br />500.00
<br />$ 1,000.00
<br />11
<br />Install 36" FPVC Pipe
<br />LS
<br />1
<br />$ 90,000 00
<br />$ 90,000.00
<br />$
<br />26,000.00
<br />$ 26,000.00
<br />12
<br />Pipe Anchor
<br />EA
<br />2
<br />$ 6,00000
<br />$ 12,000.00
<br />$
<br />9,50000
<br />$ 19,000.00
<br />Rock Slope Protection (Class
<br />13
<br />II, Method A)
<br />TON
<br />50
<br />$ 200.00
<br />$ 10,000.00
<br />$
<br />50000
<br />$ 25,000.00
<br />Empire Engineering &
<br />Construction Inc.
<br />W
<br />CCLL
<br />Total
<br />$ 16,500.00
<br />$ 16,500.00
<br />$ 21,000.00
<br />$ 21,000 00
<br />$ 500
<br />$ 6,50000
<br />$ 54.00
<br />$ 7,020.00
<br />$ 16,500.00
<br />$ 16,500.00
<br />$ 12.00
<br />$ 33,600.00
<br />$ 22300
<br />$ 22,300.00
<br />$ 54,880.00
<br />$ 54,880.00
<br />$ 92 50
<br />$ 25,900.00
<br />$ 1,900.00
<br />$ 3,800.00
<br />$11,00000
<br />$ 11,000.00
<br />$ 3,750.00
<br />$ 7,500.00
<br />$ 38000
<br />$ 19,000.00
<br />Dutch Contracting, Inc.
<br />W
<br />n
<br />Total
<br />$ 4,000.00
<br />$ 4,00000
<br />$ 12,000 00
<br />$ 12,000 00
<br />$ 6.00
<br />$ 7,800.00
<br />$ 12.00
<br />$ 1,560.00
<br />$ 15,000 00
<br />$ 15,000.00
<br />$ 8.00
<br />$ 22,400.00
<br />$ 3000
<br />$ 3,000.00
<br />$ 46,500.00
<br />$ 46,500.00
<br />$ 12000
<br />$ 33,600.00
<br />$ 1,50000
<br />$ 3,000.00
<br />$ 38,490 00
<br />$ 38,490 00
<br />$ 3,500.00
<br />$ 7,000.00
<br />$ 30000
<br />$ 15,000.00
<br />$ 324,900.00 $ 228,050.00 $ 245,500.00 $ 209,350 00
<br />Subconsultants Subconsultants- Subconsultants: Subconsultants:
<br />Superior Hydroseeding Inc Superior Hydroseeding Inc. N/A Selby's Soil
<br />
|