My WebLink
|
Help
|
About
|
Sign Out
SPECIAL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
091817
>
SPECIAL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2017 3:28:02 PM
Creation date
9/14/2017 3:20:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/18/2017
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />the City to reimburse Costco for the funds Costco has advanced for the <br />Project. <br />Based on current cost estimates and the funding sources identified above, the <br />following is a summary of the Project funding: <br />Proposal to Fund JDEDZ Transportation Improvements <br />Design & Construction Cost <br />(Excluding ROW costs not <br />Required for Stoneridge Dr & 1- <br />680 Onramp Project) $19,970,000 <br />Right of Way (ROVV) Estimate <br />(Includes Costco ROW) 1,500.000 <br />Total Project Cost $21,470,000 <br />Cost Sharing Design and Percent of <br />Construction Amount Total <br />Transportation Impact Fee (TIF) <br />(Stoneridge Drive & 1-680 <br />Onramp Project only) <br />City Contribution through Sales <br />Tax Share - 60% to City and 40% <br />to Costco Cr? 1.5% interest <br />$6 400,000 <br />6,785,000 <br />30% <br />34% <br />Costco Cash Contribution' <br />6,785,000 <br />3-4% <br />Total Funding Sources $19,970,000 <br />Right of Way (ROW) Cost Sharing Proposal <br />Costco Owned ROW Contributed to project at no charge <br />Remaining required ROW that is <br />not donated to the project Shared 50/50 with the City but Costco's portion will be added to <br />the $6,785,000 sales tax sharing agreement at no interest. <br />'Includes Costco $3.7M required TIF contribution that would be converted to a direct cash contribution to the JDEDZ <br />transportation improvements <br />Other: <br />1 Costco will issue and manage the construction contract for the transportation improvements. <br />2 Costco is estimated to be responsible for 44% of total daily trips at full build out and 78% of the trips in Phase 1 <br />The City proposes to establish a JDEDZ Transportation fee to charge subsequent JDEDZ development to <br />reimburse the City for fronting their portion of the costs to implement transportation improvements <br />Issuing and Managing Construction Contracts <br />Costco will act as the Developer on this project issuing and managing design <br />and construction contracts for the public roadway infrastructure improvements <br />that are necessary as identified in the JDEDZ DSEIR/FSEIR. The City of <br />Pleasanton will review and approve design plans as they are developed for <br />conformance with the JDEDZ DSEIR/FSEIR and City standards. The City of <br />Pleasanton will inspect infrastructure construction for conformance with <br />design plans. City will accept all public improvements for maintenance when <br />complete. Contracts for this Public Works Project will include prevailing <br />wages as required by law. <br />The construction improvements consist of several public roadway <br />improvements outlined in DSEIR/FSEIR and include the following: <br />1. Commerce Drive at Johnson Drive Signal (Mitigation 4.D -1a) <br />2. Johnson Drive at Owens Drive (North) Signal (Mitigation 4.D -1b) <br />
The URL can be used to link to this page
Your browser does not support the video tag.