ATTACHMENT 3 <br />Pleasanton Johnson Dr EDZ <br />PLANNING LEVEL COST ESTIMATE <br />Johnson Drive Improvements, Mtigation 4.D-3 <br />Roadway Items: <br />Quantity <br />Unit <br />Unit Cost <br />Item Total <br />Total <br />New Pavement Section' <br />45,860 <br />SF <br />6 10 <br />$ 458,600 <br />Cold Plane and Overlay (0.7)' <br />97,650 <br />SF <br />9 2 <br />$ 195,300 <br />Conc Sidewalk & Driveway' <br />14,650 <br />SF <br />$ 10 <br />$ 146,500 <br />Cone C&G <br />2,400 <br />LF <br />$ 30 <br />$ 72,000 <br />Driveway <br />3 <br />EA <br />$ 5.000 <br />$ 15,000 <br />Cult Ramp <br />12 <br />EA <br />$ 3,500 <br />6 42.000 <br />Retaining Wall <br />SF <br />$ 100 <br />9 - <br />Maintenance Path <br />- <br />LS <br />$ 20.000 <br />$ <br />Monument Sign <br />- <br />LS <br />$ 25,000 <br />$ <br />Imported Borrow <br />- <br />CY <br />S 75 <br />$ <br />RoadwayExcavation' <br />8,540 <br />CY <br />$ 75 <br />$ 490,500 <br />Cleanng and Grubbing <br />58,530 <br />SF <br />$ 0.5 <br />$ 29.300 <br />Remove Conc Sidewalk, C&G <br />9,250 <br />SF <br />$ 6 <br />$ 55,500 <br />Remove Trees <br />20 <br />EA <br />S 1,000 <br />$ 20,000 <br />LandscapeAmgatim & Rio -Retention <br />9,700 <br />SF <br />$ 15 <br />5 145,500 <br />Fence (New & Remove) <br />1,850 <br />LF <br />$ 30 <br />$ 49,500 <br />Pavemera Striping <br />16.170 <br />LF <br />6 2 <br />$ 32,400 <br />Pavement Markings <br />1,900 <br />SF <br />$ 10 <br />$ 19,000 <br />Relocate Overhead sign and post' <br />• <br />EA <br />$ 5,000 <br />$ - <br />Signs <br />8 <br />EA <br />S 600 <br />$ 4,800 <br />Signalized Intersection (Johnson Dr & Entry to Parcel 6) <br />1 <br />LS <br />S 350.000 <br />6 350.000 <br />Intersection Traffic Signal Modification <br />• <br />LS <br />$ 750,000 <br />$ - <br />Ramp Traffic Signal Modification <br />LS <br />5 25.000 <br />$ - <br />Street Lights' <br />11 <br />EA <br />$ 10,000 <br />9 110,000 <br />Traffic Control Allowance (50) <br />1 <br />LS <br />$ 112.000 <br />6 112,000 <br />Steen Drain System Allowance (10%( <br />1 <br />LS <br />$ 224.000 <br />5 224.000 <br />WPC / Treatment Allowance (5%) <br />1 <br />LS <br />$ 112,000 <br />$ 112,000 <br />Minor & Misc. Items (109) <br />1 <br />LS <br />$ 289.000 <br />$ 289,000 <br />Mobilization (109) <br />1 <br />LS <br />$ 296,000 <br />$ 296,000 <br />Contingency (2500 <br />1 <br />LS <br />$ 813.000 <br />$ 813,000 <br />Roadway Subtotal <br />$ 4,070,000 <br />Structure Items: <br />Quantity <br />(Un00 <br />Unit Cost <br />Item Total <br />Total <br />Widan Existing Structure' <br />- <br />SF <br />5 350 <br />$ • <br />Structure Subtotal <br />$ <br />Right of Way Items: <br />Quantity <br />Unit <br />UnitCost <br />Item Total <br />Total <br />Utility Relocation' <br />1 <br />LS <br />$ 190.000 <br />6 190.000 <br />DSRSD <br />- <br />LS <br />$ 250.000 <br />5 <br />Acquisition costs' <br />1 <br />LS <br />5 458,200 <br />5 456.200 <br />TCE <br />NIC <br />Emiromlemal Mrtgahon I.E ) <br />NIC <br />Right of Way Subtotal <br />9 650.000 <br />Subtotal "Hard Costs" <br />9 4.720.000 <br />Sof Costs° <br />Quantity <br />Unit <br />Unit Cost <br />Item Total <br />Total <br />Final Design (12.59' <br />1 <br />LS <br />6 509.000 <br />S 509,000 <br />Construction Administration (12.59' <br />1 <br />LS <br />$ 509,000 <br />$ 509,000 <br />Construction Staking (29) <br />1 <br />LS <br />S 82.000 <br />5 82000 <br />Subtotal "Soft Casts" <br />$ 1.100,000 <br />Grand Total <br />$ 5,820.000 <br />1 Neer Pavement Sedan awned a 4 S' Asphalt 95' Ammonia 000 and 17' Aggregate Slbbede <br />2 Cukl Nana all e•0eng laemeld within Me prumel 1.0115 <br />3 Assume 6' wide m+dewa1 <br />4 Reuse a<etng pmt and mat ern Irttae new 030n web and pod Im mutation <br />5 AM. musing ldreel lg46 ere le be samam0by ale Cvr4n• l50 Plea:° new ennui 1,41150 a epNo0malety300' spacing <br />6 No non n the creek for badge sirachee <br />7 UOOyoasis assumes man rndarpandline roman o.W assumed toSt 100000964$$00 A,Erores In Ira& or rebcatr5 hem <br />8 811 oata pesaieae of Roadway • 81eriuro 11,10 0017 deism) emeg.4 NMI En0neemg which is 1076 d RAM Ilene <br />9 Roadway e•ca atwn asumes 25' M a8o elnl°g voted <br />t0 0901 d veal fake wiiml pan:6.9 a 10 am to to dedt ted torIha 00:ro0a000106 <br />/1 7/2 0 1 7 <br />