Laserfiche WebLink
Figure 4 <br />P6t "t7 7 <br />sir 9IF ,t• tr H' tr t,• .._., kt1 <br />, I <br />A <br />JOHNSON DR <br />WWI A.A <br />4.1 <br />Yaw <br />8 8T814 a <br />,1.131• t v• PA. <br />IWTI w <br />Ina <br />A lit SURE 4.D•1 <br />Stoneridge Drive and 1-680 Onramp Improvements: <br />1. Modify the Stoneridge Drive at Northbound 1-680 signal programming to provide <br />additional northbound right -turn time. <br />2. Extend the existing westbound right -turn pocket at the Johnson Drive and Stoneridge <br />Drive intersection approximately 800 feet east by widening Stoneridge Drive and <br />convert the resulting lane into a through -right -shared lane. <br />3. Construct a second on-ramp lane to northbound 1-680 from the westbound Stoneridge <br />Drive approach. (See Figure 5.) <br />The Stoneridge Drive and 1-680 onramp improvements is the only project that is <br />included in the City of Pleasanton Traffic Impact Fee (TIF) (identified in the 2009 TIF <br />update). <br />Page 6 of 16 <br />