My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
091917
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2017 2:27:40 PM
Creation date
9/14/2017 2:40:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2017
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
where it will be readily accessible, and check vehicles and equipment <br />regularly for leaking oils and fuels. Dispose rags and absorbent materials <br />promptly and properly. <br />j. Concrete wash area: Locate wash out areas away from the storm drains and <br />open ditches, construct a temporary pit large enough to store the liquid and <br />solid waste, clean pit by allowing concrete to set, breaking up the concrete, <br />then recycling or disposing of properly. <br />k. Equipment and vehicle maintenance area: Use off-site repair shop as much <br />as possible. For on-site maintenance, use designated areas away from the <br />storm drainage facility. Always use secondary containment and keep <br />stockpile of cleanup materials nearby. Regularly inspect vehicles and <br />equipment for leaks and repair quickly or remove from the project site. Train <br />employees on spill cleanup procedures. <br />C. Operation Requirements <br />The Permit's operation and maintenance requirements include but are not limited to the <br />following: The operation and maintenance of treatment measures including but not <br />limited to bio-swales, lawns, landscaped areas with deep-rooted plants, oil/water <br />separator, filterra units, etc., requires completing, signing and recording an agreement <br />with Alameda County recorder's office in a format approved by the State and Alameda <br />County. <br />1. All projects, unless otherwise determined by the City Engineer or Chief Building <br />Official, shall enter into a recorded Stormwater Treatment Measures Inspection <br />and Maintenance Agreement for ongoing maintenance and reporting of required <br />stormwater measures. These measures may include, but are not limited to: <br />a. A mechanism shall be created, such as a property owners' association, to be <br />responsible for maintaining all private streets, private utilities and other <br />privately owned common areas and facilities on the site including stormwater <br />treatment measures. These maintenance responsibilities shall include <br />implementing the maintenance plan, which is attached to the Stormwater <br />Treatment Measures Inspection and Maintenance Agreement. This <br />document shall be reviewed by the City Attorney's Office and recorded with <br />the final map. <br />b. On-site storm drain inlets clearly marked and maintained with the words "No <br />Dumping — Drains to Bay." <br />c. Proper maintenance of landscaping, with minimal pesticide and fertilizer use. <br />d. Ensure wastewater from vehicle and equipment washing operations is not <br />discharged to the storm drain system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.