Laserfiche WebLink
mitigation imposed by the City on another similarly situated application in a prior successful <br /> application for a permit. The City shall use its best efforts to ensure that the selected method, <br /> condition, or mitigation meets the conditions of Civil Code Section 714(d)(1)(A) and (B) <br /> defining restrictions that do not significantly increase the cost of the system or decrease its <br /> efficiency or specified performance. <br /> F. If an application is deemed incomplete, a written correction notice detailing all deficiencies in <br /> the application and any additional information or documentation required to be eligible for <br /> expedited permit issuance shall be sent to the applicant for resubmission. <br /> G. Only one inspection shall be required and performed by the Building Division for small <br /> residential rooftop solar energy systems. Once an applicant informs the Building Division that <br /> such a solar energy system has been installed, the Building Division shall complete the <br /> inspection as soon as practical (generally within 2 days) and should include consolidated <br /> inspections. <br /> H. If a small residential rooftop solar energy system fails the inspection, a subsequent inspection <br /> is authorized and a re-inspection fee may be charged. <br />