Laserfiche WebLink
Engineering Department <br /> 34. A separate recycled irrigation water meter shall be installed unless otherwise <br /> approved by the City Engineer. <br /> 35. Per NPDES MRP Permit, source control, site design measures, and design and <br /> implementation of stormwater treatment measures are required for "special land <br /> use category" development and redevelopment projects (auto service facilities, <br /> retail gasoline outlets, restaurants, and stand-alone uncovered parking lots) that <br /> create and/or replace 5,000 square feet or more of impervious surface <br /> (collectively over the entire project site). The project developer shall submit the <br /> stormwater treatment measures with the improvement plans, for review and <br /> approval, prior to any permits issued. <br /> 36. All plantings within the stormwater treatment measure areas shall be per the <br /> Alameda County Clean Water Program "C.3 Stormwater Technical Guidance, <br /> Appendix B" dated May 2, 2016, version 5.1. <br /> 37. All water for irrigation purposes shall be recycled water and a separate recycled <br /> water irrigation meter shall be installed and irrigation meter fees paid unless <br /> otherwise approved by the City Engineer. <br /> STANDARD CONDITIONS OF APPROVAL <br /> Planning Division <br /> 38. The proposed parking lot shall be constructed in substantial conformance to <br /> Exhibit B, dated "Received, July 20, 2017" on file with the Planning Division, <br /> except as modified by the following conditions. Minor changes to the plans may <br /> be allowed subject to the review and approval of the Director of Community <br /> Development. <br /> 39. To the extent permitted by law, the project applicant shall defend (with counsel <br /> reasonably acceptable to the City), indemnify and hold harmless the City, its City <br /> Council, its officers, boards, commissions, employees and agents from and <br /> against any claim (including claims for attorneys fees), action, or proceeding <br /> brought by a third party against the indemnified parties and the applicant to <br /> attack, set aside, or void the approval of the project or any permit authorized <br /> hereby for the project, including (without limitation) reimbursing the City its <br /> attorneys fees and costs incurred in defense of the litigation. The City may, in its <br /> sole discretion, elect to defend any such action with attorneys of its choice. <br /> 40. All conditions of approval shall be attached to all permit plan sets submitted for <br /> review and approval, whether stapled to the plans or located on a separate plan <br /> sheet. <br /> 41. Planning Division approval is required before any changes are implemented in <br /> the site design, grading, landscape material, lighting, etc., before construction <br /> begins and after construction is completed. <br />