Laserfiche WebLink
park on the street and that it was acceptable; and that in the context of Downtown, the <br />pedestrian and walkable environment in the Downtown, and the desire of people to live <br />in close proximity to Main Street, tandem parking on the site would also be acceptable. <br />Chair Allen asked staff for an update on what the parking survey done by Hexagon in <br />2013 says about this area, now that there is this project and parking is a concern. <br />Mr. Weinstein replied that that is the latest study that has been done, and there are no <br />new updates to it. He added that there may be some with the new parking study that is <br />currently being done. <br />Commissioner Nagler asked staff to walk the Commission through the discussions staff <br />had with the applicant since the Work Session that, in fact, did transition the per -unit <br />parking from a two -car garage to tandem parking. <br />Mr. Beaudin stated that he did not have the conversations directly was kind of a ripple <br />effect. He noted that at the Work Session, the Commission expressed an interest to <br />increase the amount of ground -floor retail and set it back to address some <br />neighborhood concerns from a compatibility and visibility perspective, give it a little bit of <br />a front yard and create more of a stepped urban design from Main Street up the block. <br />He further noted that there was also a desire to get additional commercial parking as <br />part of the retail and office space. He indicated that in order for the developer to hold to <br />the Commission's desire to have a certain number of residential units, something had to <br />give, and the developer gave at the ground floor to provide more retail and more parking <br />for the commercial, resulting in the residential parking being pinched. He added that the <br />developer and the applicant's team present tonight can speak a little bit more about the <br />concessions they were willing to make, based on the Commission feedback they <br />received at the Work Session. <br />Commissioner Nagler inquired if there were any specific discussions between staff and <br />the applicant on changing the number of units to allow for the continuation of the <br />two -car garages and the number of units that the development ends up possessing. <br />Mr. Weinstein replied that staff discussed a lot of different options with the applicant <br />team to reconcile all of the direction provided by the Planning Commission at the Work <br />Session, and one of those options was carving out residential units and providing either <br />more parking or more residential space. He added that staff also encouraged reducing <br />the size of the residential units as another way of getting more space and more usable <br />square footage out of the project. He indicated that the applicant's team declined to <br />actually carve off residential units from the project because they felt they needed this <br />number of residential units to make the project work, but they slightly reduced the size <br />of four of the townhouse units and substantially reduced the size of the fifth unit, which <br />is now an apartment unit on the second floor. He noted that while they were able to <br />seek out more space from that process, it did not result in the provision of more parking; <br />instead, it allowed the building in front of the site to be set back a little and the <br />commercial space to be expanded. <br />Chair Allen noted that there has been a lot of discussion about retail and retail versus <br />commercial, and that there will be 975 square feet of retail. She asked staff to define <br />PLANNING COMMISSION MINUTES, December 9, 2015 Page 12 of 40 <br />