My WebLink
|
Help
|
About
|
Sign Out
PC 091113
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2010-2019
>
2013
>
PC 091113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 3:55:51 PM
Creation date
8/10/2017 3:48:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
9/11/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Ebrahimi stated that there is a map on the Hacienda Business Park website that <br />shows the community, and he pulled out one that said a little bit about the height of the <br />buildings along the Arroyo. He noted that that there is a varying height of commercial <br />buildings in the area, some in the same range as the proposed buildings at 22 feet to <br />26 feet tall, and others that are much taller. He pointed out that that the building right <br />next the project to the left on West Las Positas Boulevard, the Arroyo Center, is up to <br />40 feet in height, which is also the height seen in the back and backing up to the arroyo; <br />the two buildings to the west of the project site, Simpson Manufacturing, are also up to <br />40 feet tall, and an existing commercial building across the street, Hacienda West, is up <br />to 50 feet tall. <br />Commissioner Olson inquired what the distance is from the back of the existing building <br />on the site to the edge of the Arroyo, and what the distance will be with the new <br />building, and if it will be reduced, by how much. <br />Ms. Stern stated that staff looked into that and indicated that the current building is <br />60 feet back from the rear property line, and the closest proposed building would be <br />between 54 and 55 feet, approximately five feet closer to the rear property line. <br />Commissioner Allen asked what the height of the three -story building on the backside <br />would be, compared to a thirty -five foot tall tree. <br />Mr. Ebrahimi replied that it would be approximately 38 feet high at three stories. He <br />added that the two -story component would be 24 feet high. <br />Commissioner Ritter inquired if the buildings along the Arroyo Mocho would have <br />balconies that face out on the Arroyo or back towards the poolside. <br />Mr. Ebrahimi replied that they have not gotten to the actual design component and that <br />they have not even designed that building yet. <br />Commissioner Ritter suggested that might be something to consider when they get <br />there. <br />Commissioner Posson noted that they have talked a lot about the design standards for <br />the external portions of the building and inquired how they would approach the inside for <br />the tenants as it relates to energy efficiency and energy self- sufficiency for the project. <br />Mr. Ebrahimi replied that they have an internal task force that looks at what features can <br />be incorporated into each community they build. He indicated that the task force starts <br />its work once a site layout is designated. He added that hopefully, with the comments <br />that they have receive from the Commission tonight, they will know the site plan that is <br />going to work for this site, after which they will engage with that task force. He indicated <br />that they can come back to the Commission with all the recommendations of the things <br />they can provide for this community. <br />PLANNING COMMISSION MINUTES, September 11, 2013 Page 17 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.