My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
071817
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 10:25:43 AM
Creation date
7/12/2017 8:33:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
simim <br /> A DIVISION OF LEHR <br /> Length of time performing Installation services <br /> Lehr has been performing emergency vehicle installations since the late 1980's. In the last 7 years,our <br /> installation department has grown to handle approximately 100 vehicles per month between 20 <br /> technicians. Our Installation manager has 20 years in the industry and our technicians have been <br /> working on emergency vehicles an average of 3-4 years. We handle installations from undercover <br /> vehicles with minimal lighting and radios to full command vehicles with a full complement of lights, <br /> sirens, custom cabinets,and communication equipment. <br /> Our location in Pittsburg, Pursuit North,where the installations for this bid will be built, with 10 <br /> technicians and an installation manager with 20+years in the business has been in the upfitting industry <br /> over 20 years. Pursuit North was purchased by Lehr in 2009 and has been our installation facility serving <br /> our Bay Area customers as a division of Lehr since that time. <br /> Quality control / Assurance program / guidelines <br /> Quality control is something that Lehr takes into account during every step of the build process. We <br /> take steps to meet with the customer before parts are ordered to make sure that the equipment being <br /> put on the vehicle will work as the customer expects. Once the parts are received and the vehicles are <br /> to be delivered,we make sure that we have gone over the installations with the customer to make sure <br /> that all mounting locations, lighting controls, etc are put in writing to ensure consistency amongst the <br /> builds. All throughout the installation process,our Installation& Shop Managers are monitoring the <br /> buildups to make sure that they catch any quality control issues. And once the vehicle is completed,a <br /> final quality control inspection is performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.