My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
062017
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:28:29 PM
Creation date
6/14/2017 3:23:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/20/2017
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Fire Station 4 Wood Trim Replacement Proposal <br /> May 1, 2017 <br /> Page 4 <br /> a Attend Pre-Construction conference. <br /> Review and approve or take other appropriate action upon Contractor's <br /> submittals and shop drawings as required by contract documents. <br /> Interpret contract documents (including all sub-consultant disciplines) for <br /> proper execution and progress of construction, including responding to <br /> contractor's requests for information and clarification, and issuing ASI's <br /> (Architect's Supplemental Instructions). <br /> Make one scheduled site visit every other week during the course of <br /> construction (total of 6) to observe the project, and prepare site visit report <br /> (meeting minutes). Site visit shall include meeting with contractor and City <br /> representative to review progress of construction, review pending RFI and <br /> Change Order information, and observe the construction to verify work is <br /> proceeding in accordance with construction documents. <br /> Make one additional site visit to perform Punchlist Inspection, and one <br /> additional visit to perform Final Inspection. Punchlist Inspection will <br /> include a detailed listing of all items remaining to be completed by the <br /> Contractor. Final Inspection will certify that all work has been completed <br /> in accordance with construction documents. <br /> Assist City in review of contractor's initial and progress schedules and <br /> Schedule of Values. <br /> Assist in reviewing and processing contractor's progress payment <br /> requests, and certifying the amounts due to the contractor. <br /> Process contractor's building As-Builts, warranty information and related <br /> information by forwarding them to the City. <br /> ADDITIONAL SERVICES TO BE PROVIDED ON AN HOURLY BASIS <br /> The following items are not included in the Basic Services, and will be provided <br /> as additional services only after written authorization is received. Unless a <br /> subsequent fixed fee proposal is provided, the work will be done on an hourly <br /> basis per the attached Hourly Rate Schedule. <br /> 280 Bettencourt Street Sonoma,CA 95476 <br /> wwvv..jcfikatzarchitecturc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.